<br />The public meeting will provide information about, but not limited to, project design <br />requirements, impacts, project status, a presentation of conceptual geometries, schedule, <br />financing, and safety issues. <br /> <br />3.3 City Council Meeting. The Consultant shall attend one City Council Meeting <br />subsequent to the Public Meeting. The Consultant shall organize the comments received <br />from the public and be prepared to present the conceptual geometries and public <br />comments received. <br /> <br />Task 4 Final Design <br /> <br />4.1 Preparation of Plans, Specifications and Estimates (PS&E). The final <br />construction plans developed shall be based on and extend the design elements that were <br />developed and approved in the preliminary engineering phases of this project. Plans shall <br />be prepared on the AutoCAD Release 14 format and using Imperial (English) units. <br /> <br />Plans - During the development of the final construction plans, submittals for review shall <br />be made at design completion levels of 65%,90%, and 100% (Final). Submittals shall be <br />made to the City, affected utility companies, and other identified reviewing agencies as <br />required. The Consultant shall provide the City with five (5) copies of each review <br />submittal, in addition to the copies required for other reviewing agencies and utility <br />companies. A list of the final design drawings is anticipated to include the following: <br /> <br />Description Scale <br />Title Sheet and Location Map Var <br />Typical Sections Var <br />Key Map and General Notes N/A <br />Survey Control 1" = 200' <br />Clearing and Grubbing/Demolition 1" = 1 DO' <br />Layout Plans/Profiles 1"=20' <br />Construction Details Var <br />Utility Plans (including storm drainage) 1"=20' <br />Utility Profiles and Details (including storm drainage) 1"=20' <br />Stage Construction and Traffic Handling Plans 1"=40' <br />Signing and Striping Plans and Details 1"=20' <br />Landscape and Irrigation Plans and Details 1"=20' <br />Traffic Signal Plans (incl. Conductor Sch & Det) 1"=20' <br /> <br />65% Submittal - The 65% submittal drawings generally represent the complete final <br />design, with all elements present including outline technical specifications and special <br />provisions, contract quantities, and preliminary estimate of construction cost. Also <br />included will be the draft right-of-way requirements and preliminary utility requirements <br />and relocations. Not all project details will be included in this submittal. <br /> <br />Proposal- City of Redwood City (ApriI26, 1999) <br /> <br />Shores Area Street System Improvements <br />Page 7 <br /> <br />M:\O16-99\Proposa~PRP _1 V6 WPD <br /> <br />. n._-_......"-'-""-""" '-'-"""""'-""'-""'-- . <br />