My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt86 Caltrans
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1986
>
Agmt86 Caltrans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:20 PM
Creation date
6/10/2002 9:18:58 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Caltrans
PROJECT NAME
Holly St. interchange
RMP File Number
304
Date
1/22/1979
Reso Ref
8190, 8218, 10174
Box
2450
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~eing dropped or thrown upon vehicles passing underneath. <br /> <br /> 10.) Upon completion and acceptance of STATE's construction <br />:ontract, to relinquish to REDWOOD CITY and to SAN CARLOS those <br />portions of rights of way with roadways shown in purple and in <br />green respectively on the attached Exhibit A together with their <br />respective drainage facilities also shown in purple and in green <br />on Exhibit B. <br /> <br /> 11.) To furnish and install, by STATE's forces, all traffic <br />stripes and pavement markings required on the aforesaid <br />IMPROVEMENTS with the costs, after deducting the Federal <br />reimbursement, to be shared by REDWOOD CITY, SAN CARLOS and <br />COUNTY in the same proportion as the construction cost. <br /> <br /> 12.) To dedicate to COUNTY an avigation easement with 18 fee <br />minimum vertical clearance as shown on Exhibit C. Said <br />easement is to be made by a Director's Deed and is subject to <br />approval by the California Transportation Commission. <br /> <br /> SECTION II <br /> <br />REDWOOD CITY AGREES: <br /> <br /> 1.) To deposit with STATE within 50 days of receipt of <br />billing therefor (which,billing will be forwarded immediately <br />following STATE's bid advertising date of a construction contract <br />for the aforesaid 'IMPROVEMENTS), the amount of $127,100, which <br />figure represents STATE's estimate of REDWOOD CITY's share of the <br />construction cost and right of way acquisition cost required to <br /> <br /> °7° <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.