Laserfiche WebLink
<br /> <br />FMG ARCHITECTS <br />Finger Mey & Guadagne <br /> <br />ARCHITECTS <br /> <br />330 15TH STREET <br />OAKLAND, CA 94612 <br />510.465-8700 TEL <br />510-465-8711 FAX <br /> <br />December 23,2004 - Rev March 8, 2005 <br /> <br />Trent Greenan <br />Freedman Tung & Bottemley <br />74 New Montgomery St., Suite 300 <br />San Francisco, CA 94105 <br /> <br />Re: Redwood City Courthouse Plaza <br /> <br />Dear Trent: <br /> <br />FMG Architects along with our subconsultants are please to submit this proposal for architectural and <br />engineering services for the above project, Based on documents received and conversations we have <br />had, we propose the following professional services to continue the urban design project Freedman <br />Tung & Bottemley (FTB) has undertaken, Specifically FMG Architects (FMG) shall be the architectural <br />firm of record and develop documents necessary to have the project bid and constructed, <br /> <br />The project is divided into 4 phases as established by FTB, <br /> <br />Phase I. Project Start-Up: <br />1, FMG shall receive required information from FTB, This shall include site surveys, topographic <br />data, geotechnical reports, preliminary design documents, detailed programs and requirements <br />for specialty items such as food service, and other drawings and reports that may be pertinent <br />to the project, <br />FMG shall attend a kick-off meeting at FTB offices with all team members to establish a <br />detailed division of the work required, <br />FMG shall attend an additional meeting with FTB's lighting designer and our electrical <br />engineer to discuss the lighting requirements and parameters for the project, <br />FMG shall develop a project delivery schedule to be presented to FTB for review and revision, <br />FMG shall conduct a constructability review based on the documents received and the design <br />intent established by FTB, The results shall be transmitted to FTB for review and comment. <br />FMG's subconsultant shall develop a preliminary cost estimate based on supplied documents, <br /> <br />2, <br /> <br />3, <br /> <br />4, <br />5, <br /> <br />6, <br /> <br />Phase II. Prepare 60% Submittal: <br />1, FMG shall meet with FTB, their subconsultants, and our subconsultants to better define project <br />definition and delivery requirements, <br />FTB will deliver additional drawings and details to better explain the design intent of <br />ornamental items, FMG will consult with FTB to assure the constructability of those items and <br />do additional detailing as may be necessary to include those items in the final construction <br />documents, <br />FMG shall prepare design documents to a 60% completion level. Drawings shall be done in <br />AutoCAD and specifications in MS Word, <br />a, Site location plan <br />b, Kiosk plans, planter plans, fountain plans, <br />c. Sections and details as required, <br />d, Schedules as required, <br />e. Preliminary electrical and mechanical documentation, <br />f, Samples of unique materials for review. <br /> <br />2, <br /> <br />3, <br /> <br />. '.'."..>"'-'--""""-"'-""'.-----.--'-""-"""--'."."-' <br />