Scope of Services Exhibit "A" <br />Water Storage Reservoir #2 <br />Page 2 <br /> <br /> 2.2 Monitoring the Contractor's contaminant classification and disposal <br /> procedures. <br /> <br /> 2.3Monitoring the Contractor's compliance with his health and safety <br /> plan. <br /> <br /> 2.4Monitoring testing performed by the Contractor to~ that <br /> all contaminants have been removed. <br /> <br />3. Pile Drivinq <br /> <br /> Provide full-time on-site inspection during the indicator pile driving <br /> program. An experienced member of our geotechnical engineerin9 <br /> department will be assigned specifically to monitor the Contractor's <br /> indicator pile driving program. The geotechnical engineer will be <br /> responsible for: <br /> <br /> 3.1 Evaluating the manufacturer's specifications for the contractor's <br /> pile driving equipment prior to commencement of the indicator pile <br /> driving. <br /> <br /> 3.2 Observing pile penetration and resistance, pile resistance upon <br /> retapping, and pile driving hammer energy and efficiency during the <br /> indicator pile driving. <br /> <br /> 3.3Estsb]ishin9 and recommending the production pile driving criteria <br /> upon completion of the indicator pile driving. <br /> <br />4. Construction Stakinq <br /> <br /> This task involves installation of horizontal and vertical control <br /> staking for the new reservoir site, transmission pipeline route, <br /> drainage pipeline route, and access roadway. The scope of work is based <br /> on the assumption that control staking will be installed initially for <br /> the Contractor's use and that subsequent field staking to replace <br /> damaged slakes will be the responsibility of the Contractor or can be <br /> provided at an additional fee paid by the Contractor. This technique <br /> reduces the surveying fees paid by the City and avoids contractor abuse <br /> of the City supplied service. <br /> <br /> 4.1Stake center of tank with reference points at four radial direction <br /> and two base lines for pump station. <br /> <br /> 4.2 Stake transmission pipeline at 5 O-foot intervals and storm drain <br /> pipeline at 5 0-foot intervals for approximately 1,200 linear feet <br /> of pipe. <br /> <br /> <br />