My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 DPR Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 DPR Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2007 12:38:09 PM
Creation date
5/9/2005 9:58:47 AM
Metadata
Fields
Template:
Agreement
Contractor Name
DPR Construction
PROJECT NAME
historical courthouse restoration
RMP File Number
304
Date
5/6/2005
MO Ref
05-42; RD 07-003; 07-030
Amendment
Yes
Box
6361
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.2 CM/GC shall arrange for delivery and storage, protection and security for <br />City/Agency-purchased materials, systems and equipment, which are a part of the Project, until <br />such items are incorporated into the Project. CM/GC shall coordinate with or assign these <br />activities to the appropriate Trade Contractors who are responsible for the installation of such <br />materials, systems, and equipment. <br /> <br />2.3.6 Submittal Procedures. <br /> <br />.1 CM/GC shall establish and implement procedures with Architect and coordinate <br />the timely review of shop drawings, submittals, requests for information, samples, product data, <br />change orders, payment requests, material delivery dates, and other procedures, and maintain <br />logs, files, and other appropriate documentation. <br /> <br />.2 CM/GC shall develop and submit to City/Agency a log of all samples, material <br />lists and certifications, mix designs, schedules, and other submittals, as required in <br />specifications in Trade Contracts. The log shall indicate whether samples have been provided <br />as specified and in accordance with other provisions of this Agreement. <br /> <br />.3 CM/GC shall distribute information related to submittals in a timely manner. <br />CM/GC shall consult with Architect, Architect's consultants and City/Agency if any Trade <br />Contractor requests interpretations of the meaning and intent of the Contract Documents, and <br />assist in the resolution of questions which may arise. <br /> <br />.4 <br /> <br />CM/GC shall monitor the certified payroll for the Project as submitted by the <br /> <br />Trade Contractors. <br /> <br />2.3.7 Meetinqs. <br /> <br />.1 CM/GC shall coordinate and conduct weekly job-site progress meetings with all <br />Trade Contractors, and will prepare and distribute minutes to all attendees, City/Agency, and all <br />other appropriate parties. CM/GC shall assist in the resolution of any technical construction <br />issues. <br /> <br />.2 <br /> <br />CM/GC shall participate in other meetings as requested by City/Agency. <br /> <br />Atty/Agr/2005.003 <br />0 30805/L. Beck/50 7588 v 7 <br /> <br />Page 25 of 30 <br /> <br />---" T' ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.