Laserfiche WebLink
<br />ADDITIONAL SCOPE ITEMS <br />FINAL DESIGN OF CORDILLERAS CREEK BANK EROSION REPAIR <br /> <br />11. Participate in pre-design meeting with City staff, California Conservation Corps <br />representatives [proposed construction Contractor], Consultant, and Consultant's <br />subcontractor to discuss design effort. <br /> <br />12. Perform one additional site visit to conduct final inspection upon completion of <br />work by the Contractor. <br /> <br />13. The following scope tasks shall be performed only upon written authorization by <br />the City: <br /> <br />a. Provide support during bidding process <br /> <br />b. Preparation of as-built drawings <br /> <br />Exhibit - A <br />Page 3 of 5 <br />