My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Mark Thomas Co, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Mark Thomas Co, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 8:38:16 PM
Creation date
6/23/2005 8:40:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas Co, Inc
PROJECT NAME
woodside Road widening project
RMP File Number
304
Date
8/28/2000
Reso Ref
13983
Box
6589
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Aerially Deposited Lead <br /> <br />Our sub consultant, GEDeON, will test for aerially deposited lead where the roadway is <br />to be widened in accordance with Caltrans procedures and guidelines. In general, <br />GEDeON will excavate 65 hand auger borings to a maximum depth of 0.76 m within the <br />proposed roadway widening area. Soil samples collected from 0.0 to 0.15 m, 0.30 m to <br />0.46 m, and 0.61 to 0.76 m below ground surface and will be submitted for laboratory <br />analysis. The borings will be advanced at 100 meter intervals along the shoulders and <br />median for a total of 57 borings. In addition, approximately 8 borings will be advanced <br />along ramps at the Route 84/101 interchange. Traffic control for shoulder closures will <br />be provided as required by Caltrans. <br /> <br />A Draft report will be prepared in general confonnance to Caltrans requirements to <br />summarize the results of the field activities and laboratory testing and submitted to the <br />City of Redwood City for review. Review comments will be incorporated and a final <br />report will be prepared (four copies). <br /> <br />Phase II Testing (Haz Mat) <br /> <br />Based on the preliminary findings outlined in the Initial Site Assessment, our <br />sub consultant, GEOCON, will take soil samplings and do testing for soil and <br />groundwater contamination. It is estimated that 10 soil samples and 5 grab groundwater <br />samples will be collected for laboratory analysis. Chemical analyses will be perfonned <br />on all samples. The suite of laboratory analysis includes: <br /> <br />. Total Metals (EP A Method 6010) <br />. TPHg/BTEX/MTBE (EP A Method 8020) <br />. TPHdJmo (EPAMethod 8015) <br />. VOCs (EP A Method 8260) <br /> <br />This task includes securing pennits from San Mateo County for drilling. <br /> <br />Utilities <br /> <br />Existing utilities will be positively identified in accordance with Caltrans' Policy on High <br />and Low Risk Underground Facilities Within Highway Right of Way. Letters requesting <br />systems maps and "as-builts" will be sent to all utility companies known to have facilities <br />in the area. Existing utilities will be added to the plans and sent to respective utility <br />companies for verification. Conflicts between proposed improvements and utilities will <br />be identified on the plans and sent with letters to the utility companies requesting that <br />they prepare relocation plans. Notice to owners requesting that the utilities be relocated <br />as shown on the plans will be mailed. High risk utilities that need to be positively <br />identified according to Caltrans policy will be potholed and field surveyed. Potholing <br /> <br />City of Redwood City - Route 84 (Woodside Road) Widening <br />Proposal- PS&E <br /> <br />08/08/00 <br /> <br />7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.