Laserfiche WebLink
<br />will be done by our sub consultant, using the high air pressure method to avoid damage to <br />existing utilities. It is assumed that approximately 10 potholes will be required. <br /> <br />Draina{(e Report <br /> <br />A Draft drainage report will be prepared and submitted to Caltrans for review. <br />Comments will be incorporated and a Final Drainage Report produced. A drainage <br />evaluation will conform to Caltrans' methodology using HYDRAIN and HYDRA for <br />drainage analysis. <br /> <br />Lane Closure Report <br /> <br />A Draft Lane Closure Report will be prepared and submitted to Caltrans for review. <br />Comments will be incorporated and a Final report submitted to Caltrans for approval. <br /> <br />35% PS&E Submittal <br /> <br />The major features of the project will be developed based on the approved GAD. The <br />alignment of the roadway will not shift from that shown on the GAD. Line drawings of <br />all major plan sheets will be prepared. The line drawing is defined to include base <br />mapping, all major line work, minimal notes, and details as necessary to explain design <br />intent. Thirty (30) sets of half size plans (11" x 17") will be provided for Caltrans, City <br />of Redwood City and TA review. <br /> <br />65% PS&E Submittal <br /> <br />The plans will be updated based on Caltrans and City 35% reVIeW comments. <br />addition, the following plans will be added: <br /> <br />In <br /> <br />. Construction Details <br />. Drainage Profiles, Details, and Quantities <br />. Retaining Wall and Sound Wall Profiles and Details <br />. Stage Construction/Traffic Handling <br />. SWPPP Details <br />. Pavement Delineation and Quantities <br />. Signing <br />. Electrical (traffic signal and lighting) <br />. Landscape and Irrigation <br />. Structures <br /> <br />A draft Storm Water Pollution Prevention Plan report will be submitted separately for <br />Caltrans review. Draft technical specifications, based on Caltrans Standard <br />Specifications, July 1999, will be prepared using Caltrans Standard Special Provision <br />format. A construction cost estimate will be prepared based on the quantity takeoff form <br /> <br />City of Redwood City - Route 84 (Woodside Road) Widening <br />Proposal- PS&E <br /> <br />08/08/00 <br /> <br />8 of 10 <br /> <br />. .. 0.__'.". .--...... . <br />