My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-04-10
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 10:25:34 AM
Creation date
6/28/2005 2:22:41 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
4/10/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />?;~'1 <br /> <br />Attachment A <br /> <br />Scope of Work <br /> <br />500 Arguello Street Office Development Traffic Study <br /> <br />The purpose of the traffic study is to evaluate the impacts of the proposed office building on the <br />roadway system in the immediate vicinity of the site and. to recommend mitigation measures, if <br />needed. The impacts will be evaluated with level of service calculations for the following key <br />intersections: <br /> <br />Whipple A venue and El Camino Real <br />Whipple A venue and Arguello Street <br />Whipple Avenue and Industrial Way/Winslow Street <br />Whipple A venue and Veterans Boulevard <br />Brewster Avenue and El Camino Real <br />Brewster Avenue and Arguello Street <br />Brewster A venue and Warren Street <br />Brewster A venue and Winslow Street <br />Brewster A venue and Veterans Boulevard <br />Arguello Street and Broadway/Marshall Street <br />Marshall Street and Winslow Street <br />EI Camino Real and Jefferson Avenue <br />Woodside Road and Veterans Boulevard <br /> <br />The operations of these intersections will be evaluated during the morning and evening commute <br />periods (AM and PM peak hours) for the following scenarios: <br /> <br />Scenario 1: <br /> <br />Existing Conditions - Existing volumes obtained from counts. <br /> <br />Scenario 2: <br /> <br />Background Conditions - Existing volumes plus traffic from approved but not <br />yet constructed developments in the area. <br /> <br />Scenario 3: <br /> <br />Project Conditions - Background volumes plus traffic generated by the <br />proposed office building. <br /> <br />Scenario 4: <br /> <br />Cumulative Conditions - Existing volumes, plus traffic from approved <br />developments, plus project traffic, plus traffic from other pending <br />developments in the area. <br /> <br />The following scope had been divided into three parts as requested in the RFP dated February 4, <br />2000: Part 1 - Off-Site Traffic Impacts; Part 2 - Site Access, Parking, and On-Site Circulation; and <br />Part 3 - C/CAG Requirements. The tasks to be conducted in the analysis are: <br /> <br />PIO308-S <br />
The URL can be used to link to this page
Your browser does not support the video tag.