Laserfiche WebLink
3K•�- <br /> be located away from the area that the HOA currently maintains, the landscaping and <br /> irrigation issues are also mitigated. <br /> Subsequent to the design, the City was notified that the Califomia Coastal Conservancy � <br /> granted $90,000, to the City for the improvemer�t of a public access trail adjacent to this <br /> project. The design of this trail is appended to the design of this levee segment to gain <br /> cost efficiency in contract administration. This trail extends from the westem terminus <br /> of the levee, along Steinberger Slough, behind the water storage tank, and will merge <br /> into a future trail system that is part of the proposed hotel development (across a <br /> slough from the southern terminus of Twin Dolphin Drive). <br /> This segment of the levee and the new trail do not encroach into any wetland, but was <br /> included into the Corps. permit because. of �heir claim of `Cumulative Impacts'. The. <br /> agency that pays most attention to this segment is BCDC. Plans were sent to the <br /> agencies for review in December of 1999. BCDC responded with a minor comment, <br /> and the correction was made and Contract Documents resubmitted to them for final <br /> approval. Award of this contract rivifl not occur until' the permit extensions° form the ` <br /> agencies are finalized. <br /> The project was designed in-house in an effort to minimize the cost. The estimate of <br /> probable cost is $300,000 for the levee project and $90,000 for the Coastal <br /> Conservancy trail, for a total of $390,000. <br /> A complete copy of the Contract Documents is available for review in the Engineering <br /> and Construction office. <br /> Fiscal Impacts <br /> Funds for the levee portion of the project are available in the 1999-2000 Capital <br /> Improvement Program budget under.the Levee Improvement line items of the General <br /> Improvement District 1-64. Funds for the Coastal Conservancy trail will be reimbursed <br /> to the City in accordance with the Grant Agreement approved by this Council on <br /> � February 14, 2000. <br /> . �� <br /> - � ��°� <br /> S. Pe r Vorametsanti oe Patterson Ed Everett <br /> enior Civil Engineer Manager, Engineering & Construction City Manager <br /> SPV:ss <br /> S✓library/reports/advertise Levee Segment 1 <br /> � <br />