Laserfiche WebLink
�.3A�-8 <br /> will be submitted for Caltrans' review, comments incorporated and Final Appraisal <br /> Niaps will be prepared and submitted to Caltrans for approval. <br /> o Legal descriptions and plats will be prepared for all ri�hts of way to be acquired, <br /> including easements. A total of 4 parcels are assumed. <br /> ❑ Prepare a Caltrans Right of Way Record Map and file a record of survey for new ri�ht <br /> of way. A right of way Record Map will be prepared and submitted to Caltrans at the <br /> completion of the project. All right of way corners and angle points will be set with <br /> iron pipes and monuments after construction, and a Record of Survey will be filed. It <br /> is assumed that a pre-construction Record of Survey is not required for this project. <br /> TASK 3- 35% PS&E SUBMITTAL <br /> The major features of the project will be developed based on the approved GAD. It's <br /> assumed that the alignment of the roadway will not change from that shown on the GAD. <br /> Line drawings of all major plan sheets will be prepared. The line drawing is defined to <br /> include base mapping, all major line work, minimal notes, and details as necessarv to <br /> explain design intent. Thirty (30) sets of half size plans (11" x 17") will be provided for <br /> Caltrans and City review. <br /> TASK 4- 6�% PS&E SUBMITTAL <br /> The plans will be updated �ased on Caltrans and City 3�% review comments. Written <br /> responses to Caltrans review comments will be prepared and submitted with the 6�°�0 <br /> PS&E submittal. In addition, the following plans will be added: <br /> • Construction Details <br /> • Drainage Profiles, Details, and Quantities <br /> • Retainin� Wall Profiles and Details <br /> • Stage Construction/Traffic Handling/Detour Plans <br /> • SWPPP Details <br /> • Pavement Delineation and Quantities <br /> • Si�ning <br /> • Electncal (traffic sianal, ramp meterin� and lighting) <br /> • Landscape and Irri�ation <br /> • Pump Station <br /> • Bridge Plans (unchecked j <br /> Plans to be prepared to metric format, with Caltrans lavering conventions. A draft Storm <br /> Water Pollution Prevention Plan report will be submitted separately for Caltrans review. <br /> Draft technical specifications, based on Caltrans Standard Specifications, July 1999, will <br /> be prepared usin� Caltrans Standard Special Provision focTnat. A construction cost <br /> estimate will be prepared based on the quantity takeoff from the 6�% plans submittal, <br /> City of Belmont — Roure 101/Ralsroit Ave IC .Ylodifications 07/�6/00 <br /> Proposal — PS&F <br /> 10 <br /> � . <br />