My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-09-18
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-09-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 10:16:44 AM
Creation date
7/6/2005 8:49:38 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/18/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />08/24/00 <br /> <br />12:33 FAX <br /> <br />CH2M HILL SJC <br /> <br />141 003.- <br /> <br />1] .'J-A~ <br /> <br />Subsequent projects witlún the Specific Plan area, such as mfrastructure improvements and <br />development pemùts for individual projects, may be subject to further environmental <br />review. <br /> <br />The scope of work for this project is broken into 5 tasks, which coincide with the CEQA <br />environmental review process. A specific scope of services is provided for Task 1 in this <br />document. After the d~ion is made as to whether an MND or EIR will be prepared, <br />detailed scopes of work will be developed for subsequent tasks. <br /> <br />Task 1: Prepare Project Desaiption and Initial Study <br /> <br />Decision Point: Mitigated Negative Declaratio1'l (MND) or EIR? Tasks 2 - 5 assume <br />an EIR would be prepared. If an MND is selected, a revised scope will be provided. <br /> <br />Task 2: Prepare Adnrinistrative Dt'aft EIR <br />Task 3: Prepare and Circulate DEIR <br />Task 4: Prepare Administrative Final Em and Response to CoIIU1'lents <br />Task 5: Prepare Final EIR <br /> <br />Preparation of the Specific Plan is being directed by an Oversight Committee, comprised of <br />the City of Redwood City, the property owners within the Specific Plan, and the Redwood <br />Shores Ownexs Association (RSOA). TIle Oversight Committee meets monthly. Attendance <br />by CH2M HILL at th~ Oversight Committee meetings is included in our scope of work. <br /> <br />Task 1: PrepilIe Project Description and Initial Study <br /> <br />Task 1 begms with a kick-off meeting between the CH2M HILL and the City of Redwood <br />City planning staff. We will use this meeting to obtain information, existing studies, and <br />project materials from the Gty as necessary. FoUow;ng the meeting, we will tour the project <br />site to become familiar with the physical setting and environmental issues associated with <br />the project. <br /> <br />As part of this task, we will attend the monthly Oversight Committee meetings for <br />September, October, November, and December, 2000. We will also attend 8 Redwood City <br />Plarming Comnùssion study session, which is scheduled to occur during this task. <br /> <br />Following completion of the draft Specific Plan:in late October, we will prepare a draft <br />project description for CEQA purposes. The project description will include all of the <br />elements required under CEQA, and will be prepared with input and assistance from the <br />Specific Plan consultant. The draft project description will be circuJated for review by the <br />Oversight Committee prior to be:ing finalized. It will include maps and graphics as <br />necessary to illustrate the location and compoJ.'\ents of the Specific Plan. We will incorporate <br />as many of the graphics from the Specific Plan as possible to avoid duplication of effort. <br /> <br />Following approval by the Oversight Committee of the project description, we will prepare <br />the draft hútial Study. The draft Initial Study wiU rely on existing studies, data, and <br />techrúcal reports that are available from the City and property owners. No new techrúcal <br />analyses, other than reconnaissance-level field v;sits, will be performed for the draft Irútial <br />Study. Preparation of the draft Initial Study is intended to identify any additional tecluÜcal <br />
The URL can be used to link to this page
Your browser does not support the video tag.