My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-10-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:17:14 PM
Creation date
7/6/2005 9:09:40 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
10/23/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�1. z.-c z. <br /> No. Bidder � Bid Amount <br /> 1. Stein and Com an , Inc. — Valle'o, CA $489,090 <br /> 2. Mike Brown Electric — Cotati, CA $510,406 <br /> 3. Re ublic Electric — Novato, CA $559,395 <br /> Avera e $519,630 <br /> En ineer's Estimate ........................ $281,000 <br /> After an analysis with the Consultant, the reasons for the high bids were identified. The <br /> first reason was the fact that the Specifications call for a proprietary piece of <br /> equipment, which the supplier took advantage of. The price of the same piece of <br /> equipment, more than doubled, between RTSOP 1 and this project. The specification <br /> will be modified to allow for alternatives, allowing more competition. Unfortunately, this <br /> also means that our maintenance crew may have to deal with more than one brand of <br /> the same equipment. The second reason is the uncertainty of the design of the central <br /> radio receiver, which the Consultant will clarify prior to re-bidding. <br /> Fiscal Impacts <br /> A Federal Grant in an amount of $292,000 will be used for this project, and will be <br /> reimbursed to the City by Caltrans. A matching fund of $40,000 is appropriated in the <br /> 1999-2000 Capital Improvement Program budget for this project, under the Gas Tax <br /> Construction Fund. <br /> �' <br /> i <br /> � <br /> S. Pet r Vorametsanti o Patterson � Ed Everett <br /> Seni Civil Engineer nager, Engineering & Construction City Manager <br /> SPV:ss <br /> S/library/reports/Reject al! bids RTSOP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.