<br />Subject: Redwood Shores Parkway Widening Project - Engineering Contract -
<br />P.O, #382405-B Additional Services
<br />
<br />Dear Mr. Sue:
<br />
<br />This letter is a summary of additional work that we have performed outside of the scope of our original agreement
<br />for the Redwood Shores Parkway Widening Project.
<br />
<br />These extra work items are clearly items that were not part of our original scope but were added to the project by
<br />request of the City. and items requested to assist the City's coordination with the Electronic Arts (EA) project and
<br />shopping center project. The extra work items include:
<br />
<br />ITEM I - TRAFFIC SIGNAL MODIFICATIONS (NOT TIED TO A SITE)
<br />
<br />Item la - Traffic signal modifications at the intersection of Redwood Shores Parkway and Twin Dolphin
<br />Drive, We provided traffic signal modifications to ease the transition between the new project and the
<br />intersection of Redwood Shores Parkway and Twin Dolphin Drive, Traffic signal modification included
<br />relocation of signal heads as well as new loop detectors, relocation of pull box. and extension of conduits,
<br />We drafted up new plans and included those in our construction set for the project. The hours involved
<br />include:
<br />
<br />Title
<br />Principal
<br />Sr. Proj, Manager
<br />Engineer II
<br />Engineer I
<br />
<br />Hours
<br />11.00
<br />12,00
<br />14,00
<br />30,00
<br />
<br />Rate
<br />$135,00
<br />$113,00
<br />$76,00
<br />$68,00
<br />Subtotal
<br />
<br />Total
<br />$1,485,00
<br />$1.356,00
<br />$ 1,064.00
<br />$2,040,00
<br />$5,945,00
<br />
<br />ITEM 2 - RO,W, PLATS & LEGAL DESCRIPTIONS (SHOPPING CENTER)
<br />
<br />Item lc preparation of plats, legal descriptions and title reports for the right-of-way takes along the south side of
<br />Redwood Shores Parkway, Our original scope of work for the contract did not include preparations of plats and
<br />legal descriptions for these right-of-way takes, As the ongoing negotiations evolved with adjoining developments,
<br />Brian Kangas Foulk did two to three iterations for each of these plats and descriptions, In all we prepared five
<br />separate plats and descriptions each of which was prepared a number of times to match negotiation requirements
<br />between the City and the developers, Final copies of our plats and descriptions were delivered on May 8, 1997, The
<br />requested fee for this work was $9.187,00 broken down as follows:
<br />
<br />Title
<br />Principal
<br />Sr. Project Manager
<br />Project Manager
<br />Engineer II
<br />Survey Tech III
<br />Surveyor I
<br />
<br />Hours
<br />8,00
<br />2,00
<br />15.50
<br />5600
<br />4,00
<br />28,00
<br />
<br />Rate
<br />S 13:'00
<br />$113,00
<br />$ 9400
<br />$ 76,00
<br />$ 66,00
<br />$ 68,00
<br />Subtotal
<br />
<br />Total
<br />$1.080,00
<br />$226,00
<br />$1.457,00
<br />$4,256,00
<br />$264,00
<br />$ 1,904,00
<br />$9,187,00
<br />