<br />ITEM 6 REDWOOD SHORES P ARKW A Y VIDEO DETECTIVE SYSTEM LOOP MODIFICATIONS AND
<br />ADD ALTERNATE DESIGN (NOT TIED TO A SITE)
<br />
<br />We prepared study specs and plans for various alternatives in the project including the addition of a video detection
<br />, system and various loop modifications to accommodate that design and other alternatives. These alternatives were
<br />presented with the bid documents that were ultimately put out to bid. Our requested fee for these items is $3,478.00.
<br />This work would not have been required based on our original contract but was requested towards the end of the
<br />design process by the City,
<br />
<br />Hours
<br />
<br />Rate
<br />
<br />Total
<br />
<br />Title
<br />Principal
<br />Engineer II
<br />
<br />10.00
<br />28.00
<br />
<br />$135.00
<br />$ 76,00
<br />Subtotal
<br />
<br />$1,350,00
<br />$2,128,00
<br />$3,478,00
<br />
<br />CONSTRUCTION STAKING (NOT TIED TO A SITE)
<br />
<br />The above items were clearly documented during design as extra work, They were all based on direct request by the
<br />City, We also have a construction staking extra request in for $5,767,00 dated July 1. 1997, You have identified a
<br />backcharge of $2,100 which we would credit against the extra resulting in a total of $3,667,00 construction staking
<br />extra,
<br />
<br />In addition to the above described items a number of other work task were completed in support of the above efforts
<br />as well as completing the final design for the overall project. These items were also delineated in our January 17,
<br />1998 letter.
<br />
<br />ITEM 7 - MEDIAN MODIFICATIONS AT ELECTRONIC ARTS (ELECTRONIC ARTS)
<br />
<br />Item 1 b modifications to existing median along Redwood Shores Parkway to facilitate the left turn lane at the
<br />Electronic Arts/Shopping Center intersection and dual left turn lanes at Shoreline Drive, This item was based on a
<br />request by Adam Gee to modify additional portions of the median that where not anticipated in the original widening
<br />project to help coordinate with the on going design of the Electronic Arts and the Shopping Center sites, We utilized
<br />a total fee of $3.610,00 based on the following breakdown:
<br />
<br />Title
<br />Principal
<br />Engineer II
<br />Engineer I
<br />
<br />Hours
<br />6,00
<br />10,00
<br />30,00
<br />
<br />Rate
<br />$135,00
<br />$76,00
<br />$68,00
<br />
<br />Total
<br />$810,00
<br />$760,00
<br />$2.040,00
<br />$3.610,00
<br />
<br />ITEM 8 RIGHT-OF-WAY EXHIBIT FOR ELECTRONIC ARTS, (ELECTRONIC ARTS)
<br />
<br />This exhibit was used during your negotiations with Electronic Arts to solidify agreement on the correct right of way
<br />dedications for the Redwood Shores Parkway widening, This work was not anticipated in our original contract nor
<br />would have been required under the scope of our work on the Redwood Shores Parkway widening, Our requested
<br />fee for this work is $1,l52,OO,
<br />
<br />Title
<br />Engineer II
<br />Engineer I
<br />
<br />Hours
<br />3,00
<br />14,0
<br />
<br />Rate
<br />$76,00
<br />$66,00
<br />Subtotal
<br />
<br />Total
<br />$228,00