<br />Mr. Lowell Sue <br />City of Redwood City <br />October 4, 2000 <br />Page 3 <br /> <br />'-I,~ ß <br />(~. ) <br /> <br />ITEM 6 REDWOOD SHORES P ARKW A Y VIDEO DETECTIVE SYSTEM LOOP MODIFICATIONS AND <br />ADD ALTERNATE DESIGN (NOT TIED TO A SITE) <br /> <br />We prepared study specs and plans for various alternatives in the project including the addition of a video detection <br />, system and various loop modifications to accommodate that design and other alternatives. These alternatives were <br />presented with the bid documents that were ultimately put out to bid. Our requested fee for these items is $3,478.00. <br />This work would not have been required based on our original contract but was requested towards the end of the <br />design process by the City, <br /> <br />Hours <br /> <br />Rate <br /> <br />Total <br /> <br />Title <br />Principal <br />Engineer II <br /> <br />10.00 <br />28.00 <br /> <br />$135.00 <br />$ 76,00 <br />Subtotal <br /> <br />$1,350,00 <br />$2,128,00 <br />$3,478,00 <br /> <br />CONSTRUCTION STAKING (NOT TIED TO A SITE) <br /> <br />The above items were clearly documented during design as extra work, They were all based on direct request by the <br />City, We also have a construction staking extra request in for $5,767,00 dated July 1. 1997, You have identified a <br />backcharge of $2,100 which we would credit against the extra resulting in a total of $3,667,00 construction staking <br />extra, <br /> <br />In addition to the above described items a number of other work task were completed in support of the above efforts <br />as well as completing the final design for the overall project. These items were also delineated in our January 17, <br />1998 letter. <br /> <br />ITEM 7 - MEDIAN MODIFICATIONS AT ELECTRONIC ARTS (ELECTRONIC ARTS) <br /> <br />Item 1 b modifications to existing median along Redwood Shores Parkway to facilitate the left turn lane at the <br />Electronic Arts/Shopping Center intersection and dual left turn lanes at Shoreline Drive, This item was based on a <br />request by Adam Gee to modify additional portions of the median that where not anticipated in the original widening <br />project to help coordinate with the on going design of the Electronic Arts and the Shopping Center sites, We utilized <br />a total fee of $3.610,00 based on the following breakdown: <br /> <br />Title <br />Principal <br />Engineer II <br />Engineer I <br /> <br />Hours <br />6,00 <br />10,00 <br />30,00 <br /> <br />Rate <br />$135,00 <br />$76,00 <br />$68,00 <br /> <br />Total <br />$810,00 <br />$760,00 <br />$2.040,00 <br />$3.610,00 <br /> <br />ITEM 8 RIGHT-OF-WAY EXHIBIT FOR ELECTRONIC ARTS, (ELECTRONIC ARTS) <br /> <br />This exhibit was used during your negotiations with Electronic Arts to solidify agreement on the correct right of way <br />dedications for the Redwood Shores Parkway widening, This work was not anticipated in our original contract nor <br />would have been required under the scope of our work on the Redwood Shores Parkway widening, Our requested <br />fee for this work is $1,l52,OO, <br /> <br />Title <br />Engineer II <br />Engineer I <br /> <br />Hours <br />3,00 <br />14,0 <br /> <br />Rate <br />$76,00 <br />$66,00 <br />Subtotal <br /> <br />Total <br />$228,00 <br />$924,00 <br />$1,l52,OO <br /> <br /> <br />.'-"""".-'r--"""'---T"-"""'" .. <br />