My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-11-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-11-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2005 10:45:12 AM
Creation date
7/6/2005 9:27:15 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
11/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'7. ~-Dl~ <br /> <br />2. <br /> <br />The second phase will be and Final Document Revision Phase, in which we will <br />revise the construction documents, including the contract drawings, <br />specifications and statement of probable construction costs. <br />The third and final phase will be the Construction Services which will include <br />extensive bid and construction support, as well as construction administration <br />services. <br /> <br />3. <br /> <br />Specific Scope of Services: <br />The firm of Beals Sports Collaborative proposes to provide the following services in <br />accordance with our above stated understanding of the project. <br /> <br />A. <br /> <br />B. <br /> <br />C. <br /> <br />Project Re-start <br />1, Attend one meeting with City and School District staff to review current plans <br />and outstanding issues with respect to the design and the site. Meeting will <br />include a site visit to Garfield Charter School to address site issues. <br />Identify required changes to be completed to package organization, layout, etc. <br />Coordinate with City appropriate approval signatures for Plan approval. <br />Review construction administration documentation for Taft School in order to <br />incorporate necessary edits to Final Design Package. <br />Project Administration. <br /> <br />2. <br />3, <br />4, <br /> <br />5, <br /> <br />Final Documentation Revision Phase <br />1, Make revisions to drawings, specifications, and cost estimates to incorporate <br />comments. <br />Final Redline and Review Quality Control (QC). <br />Submittal Preparation and coordination. Submit one set of reproducibles to City <br />for bid packaging. <br />Project Administration <br /> <br />2, <br />3, <br /> <br />4, <br /> <br />Construction Services <br />Following the completion and approval of the construction documents, we propose the <br />following construction administration services: <br />1 , Bidding Phase <br />a) Kick-off meeting with City and Redwood City School District staff, and <br />the Beals Sports Collaborative. This meeting will firm up the roles and <br />responsibilities of each person and provide protocols and processes to <br />follow during construction. <br />Coordinate and Administer Bidding <br />1) Contact potential bidders <br />2) Attend site-walk pre-bid meeting <br />3) Coordinate and respond to contractor questions during the bid <br />period <br />4) Preparation of addendum as necessary <br />5) Attend bid opening <br />6) Assist the City in reviewing and analyzing the bids <br />Construction Phase <br />a) Attend pre-construction meeting <br />b) Work with City on turf spraying and other pre-construction needs <br /> <br />b) <br /> <br />2, <br /> <br />\\FILESERVER\MARKETINGlProøoses\P00\PQ0..60 Redwood Oty. GlIIf1ekl Earn Schao~GIIIf1ekl ProposaI9.18'((),áOC <br /> <br />2 <br /> <br />"""""""'T'"'-""~"T'" <br />
The URL can be used to link to this page
Your browser does not support the video tag.