My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 David Evans & Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 David Evans & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2007 2:56:19 PM
Creation date
7/11/2005 10:15:09 AM
Metadata
Fields
Template:
Agreement
Contractor Name
David Evans & Associates
PROJECT NAME
Agree - Consultant EIR-EIS COSTCO
RMP File Number
304
Date
6/29/2005
MO Ref
05-122; 06-215; 07-029
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />avoiding duplicated efforts and setting up a process directed at project efficiency and <br />timeliness. <br /> <br />Task 1.2 - Site Tour, Analysis and Literature Review <br />To better evaluate existing conditions of the project site and surrounding area, the DEA <br />project team will conduct a site tour and physical analysis. This analysis will include a <br />review of all pertinent data available at the City and/or supplied by you or other team <br />members. It is assumed that this data would include, but not be limited to: <br /> <br />. City of Redwood City General Plan; <br />. City of Redwood City Zoning Ordinance; <br />. Technical reports that have been completed at this time (including Traffic, , <br />Geotechnical, Phase I and II); <br /> <br />DEA will review and synthesize the available site analysis information as background <br />preparation for the EIR. Other studies, such as Noise and Air Quality analyses would be <br />come available as the project proceeds and will also need to be incorporated into the <br />EIR. <br /> <br />Task 1.3 - Initial Study and Notice of Preparation <br />DEA will prepare the Initial Study and Notice of Preparation (NOP) for review by the <br />City. DEA will then make requested revisions and submit the NOP to the City for <br />approval. We assume one round of revisions to the Initial Study and NOP prior to <br />printing. The NOP will be circulated by DEA for review by responsible agencies, City <br />departments, and interested members ofthe public. We assume that the City will provide <br />DEA with the mailing list for distribution. Comments received during the 3D-day NOP <br />review period will be reviewed by City staff and a decision will be made as to the need <br />to expand the scope of the EIR in response to letters received. The NOP and responses <br />will be included in an appendix to the EIR. <br /> <br />Based on our knowledge and understanding of the project and project site, it is <br />anticipated that some of the potential issues areas would be eliminated from further <br />review during the Initial Study phase of the project. These issue areas would include: <br /> <br />. Agricultural Resources; <br />. Mineral Resources; and <br />. Recreation <br /> <br />Task 1.4 - Seoping <br />DEA understands that a scoping meeting for the project has already been conducted. No <br />additional effort for this task would be required. <br /> <br />Phase 2: Screencheck Draft EIR <br /> <br />Task 2.1 - Environmental Impact Report Preparation <br />DEA will prepare the Draft EIR in screencheck form for review by the city of Redwood <br />City. The EIR and associated technical studies shall assemble all available data, originate <br /> <br />'--'-"-"----Y-"--- . <br />
The URL can be used to link to this page
Your browser does not support the video tag.