Laserfiche WebLink
<br />required. The additional services that are beyond the scope of this study include, but are <br />not limited to, evaluating additional study locations, conducting additional traffic counts <br />(conducting AM and PM peak-period intersection turning movement counts at more than <br />one (1) intersection and 48-hour volume counts at 5 roadway segments), updating the <br />technical analyses to reflect additional project descriptions, preparing conceptual designs <br />of mitigation measures, and responding to comments requiring more than 4 staff hours or <br />additional technical analysis. Fehr & Peers Associates will conduct additional services <br />upon receipt of written authorization. <br /> <br />Hydrology and Drainage <br />The EIR will address the Stormwater Pollution Prevention Program and include a <br />completed "NPDES Permit Compliance Checklist" for the project. Appropriate <br />mitigation measures, including those from the City of Redwood City's "Local Source <br />Control Measures List" and best management practices for the construction and post <br />construction condition, will be identified, as necessary, to reduce project related impacts. <br />Additionally, a discussion of tanks and pipes used for the proposed gas station USeS will <br />be identified and the potential for groundwater leakage will be evaluated. <br /> <br />Geology and Soils <br />The discussion of Geology and Soils in the EIR will be based on the geotechnical <br />investigation that has been or will be prepared by others for the project site. This study <br />will assess site conditions and provides recommendations for earthwork construction. <br />The conclusions and recommendations of the report will be summarized and any <br />necessary site preparation measures will be included as either standard conditions or as <br />mitigation measures, as appropriate. Additionally, a discussion of tanks and pipes used <br />for the proposed gas station uses will be identified and the potential for soil <br />contamination will be evaluated. <br /> <br />Hazards and Hazardous Materials <br />The discussion of hazards and hazardous materials in the EIR will be based on the <br />Phase I and Phase II Environmental Site Assessments (ESAs) to be prepared by <br />the applicant's consultant. The findings of the Phase I and II ESAs would be <br />summarized under this issue. Additionally, a discussion of the tanks and pipes <br />proposed for use by the gas station will be identified and the potential for soil and <br />groundwater contamination will be evaluated. <br /> <br />Cultural Resources <br />The cultural resources section will be based on existing data available at the City of <br />Redwood City. This would include the General Plan and General Plan EIR, the <br />geotechnical study prepared for the site (based on the soil type), and any other available <br />data. The site is currently developed and is unlikely to contain artifacts. A full analysis <br />will be presented in the EIR. Should there be a probability of cultural resources at the <br />site, appropriate mitigation would be included. <br /> <br />Biological Resources <br />At the City's request, we have included biological resources in our scope. Based on the <br />fact that the existing site is developed and neighboring parcels are disturbed, the potential <br />for encountering biological resources is minimal. DEA will provide a general evaluation <br /> <br />.-¡...".--. '--r'" <br />