My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt96 David J. Powers & Associ
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1996
>
Agmt96 David J. Powers & Associ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2005 12:02:25 PM
Creation date
7/11/2005 10:51:39 AM
Metadata
Fields
Template:
Agreement
Contractor Name
David J. Powers & Associates
PROJECT NAME
2150 Roosevelt Avenue
RMP File Number
304
Date
10/22/1996
Reso Ref
12929
MO Ref
97-034
Box
5940
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />construction impacts due to equipment exhaust and fugitive dust will be estimated, and <br />mitigation measures will be identified for potentially significant impacts. <br /> <br />Noise <br /> <br />The Initial Study will describe the existing noise environment of the project site area based upon <br />information available from the City Planning Division. The proposed project is not expected <br />to result in significant noise impacts; therefore, a quantitative analysis of vehicle generated noise <br />is not included in this scope of work. Demolition of the existing development and construction <br />of the proposed project could result in short-term impacts upon adjacent sensitive receptors. <br />The Initial Study will describe the short-term, construction-related noise impacts of the project, <br />along with appropriate mitigation measures. <br /> <br />Aesthetics <br /> <br />The Initial Study will describe the existing visual character of the project area and the projected <br />change in visual character resulting from development of the project. The Initial Study will <br />address the impact of the project on views from adjacent land uses including the impact of <br />returning the site to its original grade. Photographs of the project site and conceptual elevations <br />of the proposed residences will accompany the text to provide a visual context for the discussion <br />of visual conditions within the area. Revised grading plans and elevations will be provided by <br />Classic Communities. Mitigation measures will be identified to reduce or avoid any significant <br />visual impacts of the project. <br /> <br />Public Services & Utilities <br /> <br />The Initial Study will address the existing public services and utilities serving the project site, <br />based upon available information from the City Public Works Department and other local <br />agencies. The public services and utilities to be addressed include the following: water, sewer, <br />gas and electricity, storm drainage, fire, police, solid waste services, and schools. The Initial <br />Study will describe the increase in service demands resulting from the project, based on <br />information provided by the City staff. This information will be used to determine the <br />availability of existing services to serve the proposed development. The Initial Study will also <br />describe the potential impacts of the project upon schools due to the projected student <br />generation, based upon consultation with the Redwood City Elementary School District. <br />Mitigation measures will be identified to reduce significant impacts upon public services and <br />utilities, if appropriate. <br /> <br />Reproduction and Delivery of Administrative Draft Initial Study <br /> <br />DJP&A will prepare a total of 10 copies of the Administrative Draft Initial Study. These copies <br />will be submitted to the City staff and Classic Communities for review and comment. <br /> <br />0 <br /> <br />=~D <br />l!I~m <br />IJ~~ <br /> <br />Page 4 of 7 <br /> <br />'1- <br /> <br />-~"'-" <br />
The URL can be used to link to this page
Your browser does not support the video tag.