My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-15 0095 PC Reso 601 El Camino
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-15 0095 PC Reso 601 El Camino
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2017 9:35:31 AM
Creation date
10/30/2017 9:34:32 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
10/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONDITIONS OF APPROVAL: <br />Substantial Conformity - Applicant shall ensure that all improvements <br />substantially conform to the project plans prepared by SDG Architects, Inc. dated <br />June 30, 2017, and related information submitted by the Applicant, on file with <br />Planning Services. [COA][PLANNING] <br />Buildina Permit <br />2. Conditions in Building Permit Plans - All conditions of approval shall be <br />printed on the first page of the plans submitted to the Building Division for a <br />building permit. [COA][PLANNING] <br />3. HVAC Equipment - Locate residential split -system condensing units a minimum <br />of 30 feet from the nearest residential property. An acoustical analysis of the <br />noise from project mechanical equipment to surrounding properties should be <br />completed by a qualified acoustical consultant at final design to verify <br />compliance. [COA][PLANNING] <br />Fees <br />The following fees must be paid in full prior to issuance of the building permit unless <br />otherwise described below. <br />4. Affordable Housing Fee — Pay an Affordable Housing Fee for the new square - <br />footage of the proposed project, calculated at $20 per square -foot. [SDRI <br />[PLANNING AND HOUSING] <br />5. Parks Impact Fee — Pay a Parks Impact Fee for the proposed project, calculated <br />at $8,399.13 per unit. [SDR] [PARKS AND RECREATION] <br />6. Transportation impact Fee - Pay a Transportation Impact Fee for the net new <br />trips resulting from the proposed project. jSDR] [ENGINEERING] <br />7. Water and Sewer Fees — Pay applicable water, recycled water, and wastewater - <br />related fees as outlined on the Citv's website. ][ENGINEERING] <br />8. School Impact Fee — For residential construction or additions greater than 500 <br />square feet, pay a School Impact Fee to the Seauoia Union Hiah School District. <br />Information regarding this fee may be obtained by contacting the Sequoia Union <br />High School District at (650) 369-1411. [SDR][SCHOOL DISTRICT] <br />9. Notice Of Fees Protest — The applicant may protest any fees, dedications, <br />reservations, or other exactions imposed by the City as part of the approval or as <br />a condition of approval of this development. Per California Government Code <br />Section 66020, this 90 -day protest period has begun as of the date of the <br />approval of this application. If no protest is lodged with the City prior to the <br />ATN/RESO.0095/PC RESO 601 EL CAMINO <br />REV: 10-18-17 PR <br />Page 8 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.