My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Environmental Science Associates (ESA)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 Environmental Science Associates (ESA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 4:43:55 PM
Creation date
11/21/2017 9:08:42 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates (ESA)
PROJECT NAME
Harbor View Project
RMP File Number
304
Date
11/17/2017
MO Ref
17-205, 18-149, 19-167, 20-139
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The comparative impacts of each alternative (compared the proposed Project) will be <br />discussed qualitatively ("greater than/less than"), based on comparative trip generation. <br />the Consultant will conduct a quantitative comparative analysis, quantifying operational <br />air quality emissions, GHG emissions, estimated population and employment, and a <br />complete quantitative analysis including an LOS analysis. This scope assumes that up to <br />two (2) photosimulations would be prepared to support the alternatives, if warranted (see <br />Task 4.1, Aesthetics, under the Technical Tasks by Topic section of this scope). All <br />results will be presented in matrix or other tabular form. <br />Noticing and Related Deliverables: Consultant will prepare and submit an Administrative Draft <br />EIR (ADEIR) for two (2) rounds of review, as well as a Screencheck draft. With this Task 4, the <br />Consultant will prepare and submit for the City's review and approval a Draft EIR References <br />Record, which includes a list and copies of all documents referenced in the Draft EIR. With this <br />Task 4, Consultant will also prepare for City review and approval a Notice of Availability (NOA) of <br />the Draft EIR and a Notice of Completion (NOC) of the Draft EIR. Consultant will distribute the <br />NOA and NOC (as appropriate) to designated public and quasi -public agencies (updated list from <br />Task 3 [NOP and Scoping], including those through the State Clearinghouse) and other persons <br />who commented during the EIR Scoping process. The Consultant assumes the City will <br />appropriately distribute the NOA to all interested persons or organizations. <br />Task 5: Prepare Response to Comments / Final EIR, CEQA Findings, and Mitigation <br />Monitoring and Reporting Program. <br />After the 45 -day (or longer if specified by the City) public review and comment period for the Draft <br />EIR, the Consultant will organize and assess the public comments received on the Draft EIR and <br />recommend appropriate response approach for each. This scope of work includes approximately <br />150 total labor hours to prepare the initial draft of responses to comments.l Upon Consultant's <br />receipt and review of all comments on the Draft EIR, it will discuss with the City the adequacy of <br />this scoping assumption given the actual work necessary. This scope does not assume the <br />inclusion of any information receive in response to the 2016 Responses to Comment. <br />TASiK.S,��>fl(�ftABLES <br />Summary of Public Comments on <br />the Draft EIR and Approach to <br />Responses Memo (PDF and <br />Word files) <br />AFEIR 1 and MMRP (PDF and <br />Word files, 10 printed copies) <br />• AFEIR 2 and MMRP and Findings <br />(PDF and Word files, 10 printed <br />copies) <br />• Screencheck Final EIR and <br />Findings (PDF and Word files) <br />Final EIR and Findings (PDF file, <br />Page 12 of 26 <br />REV: 11-08-17 PR <br />ATTY/AGR.2017.262/ESA / Harbor View Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.