Environmental Science Associates (ESA)
PROJECT NAME
Harbor View Project
RMP File Number
304
Date
11/17/2017
MO Ref
17-205, 18-149, 19-167, 20-139
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
for all tasks. This effort is therefore incorporated into each task. Specifically, the Consultant's <br />project manager will be the point -of -contact for the City Project Team; direct all components of the <br />scope of work; manage subconsultants; ensure compliance with Consultant's quality assurance / <br />quality control (QA/QC) program; provide monthly progress relative to the budget and schedule <br />(with invoices); and participate in designated project meetings as scoped. A combination of in- <br />person and telephone conference meetings is to occur as needed. <br />Technical Tasks by Topic <br />This section focuses on the project level technical analysis to be conducted for each <br />environmental topic in the EIR. The overall work tasks that are required for every CEQA topic, as <br />listed in Task 4 (Prepare Draft EIR), are not repeated below for each topic. The specific technical <br />tasks described below would largely occur during development of the Draft EIR in Task 4 and <br />therefore are numbered as sub -task of Task 4 (e.g., Tasks 4.1, 4.2, etc.). <br />4.1 Aesthetics <br />Context: <br />Consultant will: <br />Data Needs: <br />The Project would alter the visual <br />visual <br />Coordinate with the City to reconfirm from the 2015 EIR the <br />Complete Plan Set, <br />character the Project site. It would also <br />scenic view corridors and resources to be considered in the <br />including Landscape Plan. <br />potentially alter r ighl11! l - g and <br />given scale <br />glare oondpment <br />EIR. <br />City reconfirmation of <br />development and office use proposed. <br />an e u o <br />• Coordinate with the C' to reconfirm from the 2015 EIR u to <br />p <br />scenic view corridors and <br />five (5) public viewpoints from which photographic visual <br />any other visual resources <br />simulations of the Project would be prepared. <br />to be considered. <br />• Peer review project sponsor -prepared photographic visual <br />City reconfirmation of <br />simulations of the Project, comparable to those presented in the <br />public viewpoints from <br />2015 Draft EIR. <br />which visual simulations <br />• Review detailed information, illustrations and plans of the <br />shall be prepared. <br />Project and, using objective descriptive categories, discuss <br />Assumptions: <br />whether the Project would substantially degrade or obstruct <br />Minimal change is <br />publidy-accessible scenic views or substantially degrade the <br />existing visual character or quality of the area. <br />anticipated to the Setting <br />from the 2015 Draft EIR. <br />• Describe and assess the photographic visual simulations. <br />• Up to five (5) photographic <br />• Qualitatively assess the potential change in nighttime lighting <br />visual simulations of the <br />and glare effects. <br />Project (with and without <br />project), to be prepared by <br />the project sponsor's <br />architect and peer <br />reviewed by Consultant <br />• No project -level <br />photographic visual <br />simulations will be <br />prepared by Consultant <br />4.2 Air Quality and Health Risk <br />Context: <br />Consultant will: <br />Data Needs: <br />The Project site is located in an air <br />Discuss emissions likely to be generated during construction <br />• Estimated buildout <br />basin that is designated as <br />and qualitatively discuss the potential for construction dust <br />schedule for the Project. <br />nonattainment for the state and federal <br />(espedally during grading) to cause local excesses of ambient <br />, Earth Calculations/Gradinc <br />ambient air quality standards far <br />particulate standards and identification of policies and Best <br />Plan <br />ozone and particulate matter. The air <br />Practices that would represent adequate mitigation measures. <br />basin is also designated as a <br />maintenance area for carbon <br />Assess the consistency of the Project with local plans, with <br />• Construction Phasino and <br />E uii ant Data <br />monoxide. <br />reference to population and employment forecasts as well as <br />Sustainabilty measures <br />trends in vehicle miles traveled (VMT). Discuss the potential for <br />beyond Cal reen. <br />Page 14 of 26 <br />REV: 11-08-17 PR <br />ATTY/AGR.2017.262/ESA / Harbor View Project <br />