SimTraffic to capture the effects of queuing between intersections. Fehr & Peers will analyze the <br />remaining 12 intersections in Synchro as these intersections are farther away from the <br />interchange and unlikely to be directly affected by congestion spilling back from that interchange. <br />Fehr & Peers will conduct the freeway segment and ramp analysis consistent with the IHSP <br />DEIR and other Redwood City studies analysis for the locations listed above. <br />In addition to the traffic analysis, Fehr & Peers will qualitatively describe pedestrian, bicycle, and <br />transit facilities in the study area, including in the Inner Harbor area and connections between <br />the project site and Downtown Redwood City. <br />Task 3 — Proiect Travel Demand <br />Project travel demand characteristics include trip generation, distribution, and assignment. Fehr <br />& Peers will summarize the trip generation based on a Project Description and Site Plan <br />provided by the City. Fehr & Peers will also use Mainstreet (same as MXD+ applied to the IHSP <br />DEIR), our proprietary trip generation tool, to estimate potential reductions in vehicle trips that <br />may be appropriate based on the local mix of land uses, demographics of the neighborhood, and <br />proximity to transit. Fehr & Peers will summarize total vehicle trips associated with the Project. <br />Using a similar trip distribution and trip assignment patterns used in the IHSP DEIR, Fehr & <br />Peers will assign vehicle trips to the roadway network. This will include the study intersections <br />and freeway segments and ramps listed above. <br />Fehr & Peers will prepare two versions of the trip assignment under Existing Plus Project <br />conditions — (1) without the Blomquist Extension, (2) with the Blomquist Extension. Fehr & Peers <br />will assume the Blomquist Extension will be in place under all Cumulative scenarios. For all With <br />Blomquist scenarios, Fehr & Peers will assume the intersection of Maple Street / Blomquist <br />Street will operate as a single lane roundabout. <br />Task 4 — Existino Plus Proiect Conditions <br />Fehr & Peers will add the project -generated vehicle trips developed in Task 3 to the existing <br />conditions traffic volumes developed in Task 2 to create Existing Plus Project Conditions traffic <br />volumes. <br />Fehr & Peers will complete an impact assessment by comparing the results of Existing Plus <br />Project Conditions to the Existing (no Project) Conditions for the 18 study intersections and two <br />future project driveways. Identification of impacts will be determined by comparing the results to <br />the City's Significance Criteria presented in the Redwood City General Plan. Fehr & Peers will <br />identify mitigation measures for significant impacts and discuss feasibility and implementation <br />factors with City Staff for comment and concurrence prior to completing the study. <br />Task 5 — Cumulative Conditions <br />Fehr & Peers will use Cumulative (year 2040) forecasts previously prepared for the IHSP DEIR <br />and US 101/SR 84 Interchange Improvement Project to create Cumulative intersection turning <br />movement forecasts for the nine overlapping study intersections with that study. All freeway <br />segments and ramps were included in that study as well. Fehr & Peers will use the same C/CAG <br />model as the IHSP DEIR to develop AM and PM peak hour turning movement forecasts for the <br />10 new study intersections not covered in the IHSP DEIR. <br />To create Cumulative No Project turning movement forecasts for the nine overlapping <br />intersections and all freeway segments and ramps, Fehr & Peers will use the IHSP DEIR <br />Page 22 of 26 <br />REV: 11-08-17 PR <br />ATTY/AGR.2017.262/ESA / Harbor View Project <br />