My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Environmental Science Associates (ESA)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 Environmental Science Associates (ESA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 4:43:55 PM
Creation date
11/21/2017 9:08:42 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates (ESA)
PROJECT NAME
Harbor View Project
RMP File Number
304
Date
11/17/2017
MO Ref
17-205, 18-149, 19-167, 20-139
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Appendices and References <br />Task 2: Prepare Response to <br />Comments / and Supporting Technical <br />Analyses. <br />Based on Consultant's assessment of comments to date, <br />the proposed response to comments approach includes <br />preparation of four master responses (discussed under <br />Task 2.4), which will respond to issues raised in multiple <br />comments or warranting special attention. All responses <br />to individual responses will refer back to the applicable <br />master responses where appropriate. <br />• AFEIR 1 (PDF and Word riles, 10 printed <br />copies) <br />• AFEIR 2 (PDF and Word files, 10 printed <br />copies) <br />• Screencheck Final EIR (PDF and Word files) <br />• Final EIR (PDF file, 50 CDs, 50 printed <br />copies) <br />As subconsultant to Consultant, Fehr & Peers (Fehr & Peers Task 4) will contribute to master <br />responses and individual responses to transportation -related public comments for the Final EIR. We <br />have assumed that no substantial analysis is required for the responses, other than described in Task <br />2.1. (Optional tasks would include additional intersection analyses if desired.) <br />The detail provided in Attachment A is the basis for the labor effort estimated in the cost estimate and <br />schedule <br />Task 2.1 —Transportation Analysis (Fehr & Peers) <br />Consultant will direct Fehr & Peers to conduct the following tasks to support the responses to <br />comments: <br />Task 2.1.1 — Trip Generation Comparison (Fehr & Peers Task 1). To address <br />comments regarding employment density applied throughout the Draft EIR, Fehr & Peers <br />will create trip generation estimates for up to eight (8) project alternatives, including all <br />alternatives analyzed in the Draft EIR, plus the Applicant's Revised Project (Task 2.2) and <br />the new "50-50" No Project / Existing Zoning Alternative (Task 2.3). Fehr & Peers will <br />compare trip generation rates from ITE and RWC Moves based on total square footage <br />and number of employees and select the most appropriate rates to use for each <br />alternative. Fehr & Peers will prepare a table summarizing the results. This task includes <br />the additional estimate of trip generation for the Draft EIR Project as needed to support a <br />proposed master response to comments on the Draft EIR (Task 2.4); this scope does not <br />propose to reanalyze the Draft EIR Project. The ESA Project Manager and Fehr & Peers <br />will attend two (2) meetings with City staff to discuss theresults. <br />Task 2.1.2 — VMT Update (Fehr & Peers Task 2). To support the analysis of the <br />Revised Project (Task 2.2), Fehr & Peers will prepare a VMT analysis for the Revised <br />Project using methodologies consistent with those used in the Draft EIR. Fehr & Peers <br />Will summarize the revised VMT analysis and incorporate the write-up into the Final EIR. <br />The VMT analysis will continue to be consistent with the Draft Redwood City <br />Transportation Analysis Guidelines (November 2017). Since final VMT thresholds of <br />significance have not been adopted by the City, Fehr & Peers will present this <br />assessment for informational purposes only. <br />Page 4 of 10 <br />REV: 08-06-19 PR <br />ATTY/AGR.Arnend No. 2/ESA Harbor View Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.