Laserfiche WebLink
• MR -2 Supplemental Employment Density. This master response will utilize <br />subconsultants additional trip generation data (Task 2.1.1) and associated daily traffic <br />volumes (ADT), employment density and VMT associated with the Draft EIR Project, <br />and how the analysis of the Revised Project compares to the information presented in <br />the Draft EIR. <br />• MR -3 Sea Level Rise. Given the high number of comments and interest focused on <br />concerns regarding the methodology and assumptions regarding the Project site <br />relative to sea level rise and future flood risk, this master response will address <br />questions, address the City's policies and approach, and redirect comments to the Draft <br />EIR analysis. <br />• MR -4 Comments on Project Merits. This is a master response that responds to the many <br />comments provided regarding the merits of the project rather than its physical <br />environmental impacts. <br />Task 2.5 — Meetings Consultant and subconsultant will attend meetings and participate in <br />conference calls during preparation of this work. For cost estimating purposes a total of up to 36 <br />hours is assumed, encompassing approximately six (6) one-hour conference calls and two (2) in- <br />person meetings (including those specified throughout Task 2). <br />Task 2.6 — Documents Consultant will prepare and submit an Administrative Response to <br />Comments / Final EIR (AFEIR) for two (2) rounds of review, in addition to a Screencheck draft. <br />Task 3: MMRP, References and Findings. <br />Consultant will prepare a Mitigation Monitoring and <br />Reporting Program (MMRP) pursuant to CEQA and the • MMRP (with AFEIR land AFEIR 2 in Task2) <br />City's existing template (if available). The MMRP will be • Updated References Record (PDF file) <br />submitted as part of AFEIR 1. Consultant will also <br />Draft CEQA Findings (Word file) <br />supplement the Draft EIR References Record to <br />incorporate any new documents referenced in the <br />Response to Comments / Final <br />EIR. Consultant will prepare draft CEQA Findings and Statement of Overriding Considerations <br />pursuant to the City's existing template. The draft would be submitted as a part of AFEIR 2. <br />Task 4: Council Hearings, Presentations and <br />Notice of Determination. <br />Task 4.1 Hearings/PowerPoint. ESA, Fehr & Peers <br />and as -needed technical staff and other subconsultants <br />will attend and assist City staff to prepare for up to four <br />(4) public hearings: (1) Final EIR Review and <br />Recommendation Public Hearings (Planning <br />Commission and City Council), and (2) EIR Certification <br />Page 7 of 10 <br />IIATKII 811-WR1I5 <br />ATTY/AGR.Amend No. 2/ESA Harbor View Project <br />• Up to three (3) Final EIR meetings at the City <br />Council <br />• Final EIR Powerpoinl Presentation <br />• Draft and Final Notice of Determination <br />(Word rile) <br />