Laserfiche WebLink
11. Water and Sewer Fees — Pay applicable water, recycled water, and <br />wastewater -related fees as outlined on the Citv's website. <br />S� DRI[ENG[NEER]NG] <br />12. Notice of Fees Protest — The applicant may protest any fees, dedications, <br />reservations, or other exactions imposed by the City as part of the approval or <br />as a condition of approval of this development. Per California Government Code <br />Section 66020, this 90 -day protest period has begun as of the date of the <br />approval of this application. [SDR][OFFICE OF THE CITY ATTORNEY] <br />Landscaping and Site Improvements <br />13. Water -Efficient Landscaping — Provide a landscaping and irrigation plan <br />conforming to the California Water -Efficient Landscape Ordinance (AB 1881), <br />including an automatic irrigation system (drip, micro -spray, or bubblers) with a <br />rain sensor, and show these measures on the building permit plans. <br />[COA][PLANNING] <br />14. Tree Survey - Provide a tree survey that identifies type, diameter at breast <br />height (DBH), condition and location prior to building permit issuance. <br />[COA][PLANNING] <br />15. Tree Protection - Provide tree protection measures for ordinance -sized trees <br />near the project and show these measures on the building permit plans. <br />[COA][PLANNING] <br />16. Tree Removal Permit - Obtain a Tree Removal Permit for the removal and tree <br />trimming of all ordinance -size trees (number, type and location) defined within <br />the City's Tree Preservation Ordinance prior to building permit issuance. <br />Sf DRI[PLANNING] <br />17. Street & Creek Trees - A total of twenty-two (22) 24 -inch box trees shall be <br />planted along Bradford and Redwood Creek frontages. The final tree species <br />and locations and boulder grouping locations shall be coordinated with the <br />Parks Landscape Architect and Redwood Creek Restoration Project. These <br />improvements shall be included as part of the building permit submittal <br />package.Sf DRI[PLANNING] <br />18. Stormwater Runoff - Post -construction runoff into the storm drain shall not <br />exceed pre -construction runoff levels. The applicant's design professional shall <br />evaluate the project's impact to the City's storm drainage system and shall <br />substantiate their conclusions with drainage calculations to the satisfaction of <br />the City Engineer. The project shall be designed in conformance with the <br />Drainage Guidelines for Commercial Development. [SDR] [ENGINEERING] <br />19. Exterior Lighting — Provide a lighting plan for proposed exterior lighting, <br />ATTY/RESO.0107/PC RESOAPPROVING DOWNTOWN PLAN COMMUNITY PERMIT -707 BRADFORD <br />REV: 12-01-17 PR <br />Page 9 of 23 <br />