My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-01-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-01-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 12:26:31 PM
Creation date
1/18/2018 1:21:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/22/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.C. - Page 2 <br />industrial and manufacturing uses with a height limit of 100'. The GI district limits office <br />use to 10% of the site, limits electronic equipment facilities to 70% floor area, but does not <br />have a maximum floor area for other uses. Light industrial uses, such as warehousing <br />and distribution uses, or research and development type uses, such a biotechnology <br />companies with onsite laboratories, would be allowed (permitted by right or conditionally <br />allowed) in these districts. <br />The applicant is requesting a General Plan and Zoning land use designation of <br />Commercial -Office Professional/Technology, which provides opportunities for small and <br />large-scale professional offices, office complexes and campuses with a maximum floor <br />area of 1.0 and maximum height of up to eight stories with a coordinated master plan. <br />Figure 1- Site Plan and Project Data <br />u �KOMUMT5TEEEL_ - n.mennm amss.u.•o <br />peaa�maa:, <br />��PG+E,PROPEfIT'r <br />Proiect Background <br />The project site is located within the Inner Harbor Specific Plan (IHSP) study area, for <br />which a Draft Environmental Impact Report (DEIR) was prepared and released for public <br />review in 2014.1 The IHSP was not adopted and the IHSP EIR was not certified. Further <br />work on the IHSP is not anticipated at this time; however, the plan may be used for park <br />planning and infrastructure purposes in the future. Technical documentation and <br />background materials available as part of the IHSP process and applicable to the project <br />site will be referenced in the Project EIR, as appropriate. The IHSP Draft Environmental <br />Impact Report included a project -level analysis of an earlier version of the Applicant's <br />proposed project ("Harbor View 2015"). A draft Mitigation Monitoring and Reporting <br />1 Redwood City, City of, 2015. Inner Harbor Specific Plan and Harbor View Project Draft Environmental Impact Report, <br />State Clearinghouse No. 2014112027. October. <br />Page 2of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.