My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-02-25
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-02-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:51:37 PM
Creation date
3/11/2002 7:47:01 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
2/25/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Work <br /> <br />Teak 1: Kick-off Project and Prepare Project Description <br /> <br />Task 1 begins with a kick-off meeting between CH2M HILL, City of Redwood City staff, <br />SBSA, and Kennedy/Jenks. We will use this meeting to obtain information and project <br />materials from the City and others as necessary. Following the meeting, we will tour the <br />project area to become more familiar with the physical setting and environmental issues <br />associated with the project. <br /> <br />We will then prepare a draft project description for CEQA purposes. The project description <br />will include all of the elements required under CEQA, including maps and graphics as <br />necessary to Illustrate the location and components of the recycled water project. Again, we <br />assume that KennedylJenks will provide us with the maps and graphics associated with the <br />recycled water facilities, and we will use as many of the graphics from the Final Report as <br />possible to avoid duplication of effort. The draft project description will be cimulated for <br />review by the City and SBSA prior to being finalized. <br /> <br />Meetings: One kick.off meeting and field visit. <br /> <br />Deliverables: Draft and final project description (10 copies). <br /> <br />Taak 2: Prepare Initial Study and Circulate IS/ND <br /> <br />Following approval of the project description, we will prepare the draft Initial Study. Our <br />scope assumes that we will rely on existing studies, data, and tachnlcal reports that are <br />available from the City and other entities. These data and technical reports may include: <br />roadway characteristics along the pipeline route (recent traffic volumes, roadway and <br />Intersection configurations, parking/bike path locations, etc.); geotechnlcal reports; known <br />sub-surface contamination locations; major utility locations; cultural resources surveys, etc. <br />No new technical analyses or modeling, other than reconnaissance-level field visits, will be <br />performed. A Phase I Environmental Site Assessment is not included In this scope of work. <br />We will use the most current version of the Initial Study Checklist from the Governor's Office <br />of Planning and Research. Responses will be prepared for each item on the checklist. <br /> <br />We will submit the administrative draft Initial Study for internal review by the City and SB.SA, <br />then attend a meeting to go over the content and conclusions in the draft IS. The City will <br />provide a coordinated set of comments/edits to us for incorporation into a revised <br />document, called the Screencheck IS. Following final review and comment on the <br />Screencheck IS by the City, we will finalize the IS/ND, prepare the Notice of Completion <br />cover sheet, and provide the required number of copies to the City. We assume the City <br />will develop and maintain the mailing list for the IS/ND, and perform the distribution of the <br />document, Including the copies to be sent to the State Clearinghouse. We will also provide <br />the City with a camera-ready copy of the document, for future copying if necessary. <br /> <br />Meetings: One meeting to discuss administrative draft IS. <br /> <br />Deliverables: 10 copies of the administrative draft IS; 2 copies of the Screencheck IS; <br />Notice of Completion form; 50 copies of IS~ND for distribution by the City. <br /> <br /> 2OF6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.