<br />Vera), from grade 30 and 25 over 1500' would permit waters to flow
<br />freely through. the park at an approx. 1/3% grade. Mr. Sue pointed
<br />out that the open stream system would be less costly (Basic Park-
<br />$293,550, stream 30" bypass recirculation and grading - $171,000,
<br />to an estimated cost (including 2~~ factor) total of $464,550) than
<br />a culverted channel (Basic Park -$293;550, culvert -$300,000, import
<br />fill (30,000 yds) -$90,000~ to an estimated total cost (including
<br />2~,k,. factor) at $683, 550. .
<br />
<br />Basic Park Development costs involved:
<br />Site preparation and demoi1ition -allow
<br />Staking and Job Foreman -allow
<br />Grading-approx. 17 acres - allow
<br />Drainage - 30-40 inlets-3,OOO run-allow
<br />Turf Irrigation -8 acres
<br />Irrigation Mains
<br />Paths - 9 ft.
<br />6 ft.
<br />Bridgès - 3
<br />Planting & irrigation~allow
<br />2~,k, factor
<br />
<br />$15,000
<br />12,000
<br />40,000
<br />25,000
<br />48,000
<br />10,000
<br />35,800
<br />15,750
<br />18,000
<br />~IJ2LfLO~q 244 , 550
<br />49 000
<br />
<br />- Jt;.. IIo. ~, b.-.-.DIL ....
<br />
<br />. $293,550
<br />Basic Park Development does not include IIDiscretionary Developmentll
<br />~ou~~ - Discretionary Development ~ restrooms, upgrading existing
<br />bldg., sewers and manholes, lighting, panels and misc. electrical,
<br />parking, drives, drinking fountains and potable water runs, signs
<br />and park furniture - $232,300.
<br />G!P~Jt! - tots play area, older children play area, spray pool,
<br />gymnastic athletic area, family picnic, group picnic (500), group
<br />picnic (300), multi-use te~race and group ;icnic - $139,200.
<br />g~p~~S - relocation and upgrading of_McGarvey Field, clay infield,
<br />dugouts, walls, backstop, bleachers, tennis courts, basketball,
<br />volleyball, tennis practice backstop and paving - $60,000.
<br />~CtldE.II'.Q - upgrade Griffin and Bechet Field light, underground main
<br />to Griffin, lighting-basketball, volleyball, tennis, pract~ce tennis,
<br />lighting McGarvey Field, Main extension, terrace Veterans Memorial
<br />entry~Calif. National Guard, Entry-Forty Niner building,$132,500.
<br />Group E = Area M - plan B -$45/OOO~ Area N - plan B -$10,000~
<br />Area 0 - plan B - $10,000; Area P - plan B ~ $40,0001 Area Q - plan
<br />C - $105,000; total: $252,000.
<br />*Development of Area Q, plan C: staking and job foreman -$4,0007
<br />site preparation and demolition -$5,000; paths - 61 -$4,500,9'-
<br />$2,750: group picnic (200) -$7,000; play area -$5,000; putting green
<br />-$8,000; turf and irrigation -$18,000; Drainage -$3,000; 20% factor
<br />-$19,000. Total -$104,250.
<br />
<br />,
<br />",
<br />
<br />~":
<br />)
<br />
<br />, '
<br />
<br />Mr. Sue noted that stream system would have 1 ft. high concrete
<br />walls and bottom paved, with walkway 1 side or perhaps both sides.
<br />
<br />Mr. Ullrich noted his preference for the stream plan and noted cost
<br />is substantially less than for the culverted plan but cautioned that