Laserfiche WebLink
<br /> <br /> <br /> <br />13 <br /> <br />Vera), from grade 30 and 25 over 1500' would permit waters to flow <br />freely through. the park at an approx. 1/3% grade. Mr. Sue pointed <br />out that the open stream system would be less costly (Basic Park- <br />$293,550, stream 30" bypass recirculation and grading - $171,000, <br />to an estimated cost (including 2~~ factor) total of $464,550) than <br />a culverted channel (Basic Park -$293;550, culvert -$300,000, import <br />fill (30,000 yds) -$90,000~ to an estimated total cost (including <br />2~,k,. factor) at $683, 550. . <br /> <br />Basic Park Development costs involved: <br />Site preparation and demoi1ition -allow <br />Staking and Job Foreman -allow <br />Grading-approx. 17 acres - allow <br />Drainage - 30-40 inlets-3,OOO run-allow <br />Turf Irrigation -8 acres <br />Irrigation Mains <br />Paths - 9 ft. <br />6 ft. <br />Bridgès - 3 <br />Planting & irrigation~allow <br />2~,k, factor <br /> <br />$15,000 <br />12,000 <br />40,000 <br />25,000 <br />48,000 <br />10,000 <br />35,800 <br />15,750 <br />18,000 <br />~IJ2LfLO~q 244 , 550 <br />49 000 <br /> <br />- Jt;.. I Io. ~, b.-.-.DIL .... <br /> <br />. $293,550 <br />Basic Park Development does not include IIDiscretionary Developmentll <br />~ou~~ - Discretionary Development ~ restrooms, upgrading existing <br />bldg., sewers and manholes, lighting, panels and misc. electrical, <br />parking, drives, drinking fountains and potable water runs, signs <br />and park furniture - $232,300. <br />G!P~Jt! - tots play area, older children play area, spray pool, <br />gymnastic athletic area, family picnic, group picnic (500), group <br />picnic (300), multi-use te~race and group ;icnic - $139,200. <br />g~p~~S - relocation and upgrading of_McGarvey Field, clay infield, <br />dugouts, walls, backstop, bleachers, tennis courts, basketball, <br />volleyball, tennis practice backstop and paving - $60,000. <br />~CtldE.II'.Q - upgrade Griffin and Bechet Field light, underground main <br />to Griffin, lighting-basketball, volleyball, tennis, pract~ce tennis, <br />lighting McGarvey Field, Main extension, terrace Veterans Memorial <br />entry~Calif. National Guard, Entry-Forty Niner building,$132,500. <br />Group E = Area M - plan B -$45/OOO~ Area N - plan B -$10,000~ <br />Area 0 - plan B - $10,000; Area P - plan B ~ $40,0001 Area Q - plan <br />C - $105,000; total: $252,000. <br />*Development of Area Q, plan C: staking and job foreman -$4,0007 <br />site preparation and demolition -$5,000; paths - 61 -$4,500,9'- <br />$2,750: group picnic (200) -$7,000; play area -$5,000; putting green <br />-$8,000; turf and irrigation -$18,000; Drainage -$3,000; 20% factor <br />-$19,000. Total -$104,250. <br /> <br />, <br />", <br /> <br />~": <br />) <br /> <br />, ' <br /> <br />Mr. Sue noted that stream system would have 1 ft. high concrete <br />walls and bottom paved, with walkway 1 side or perhaps both sides. <br /> <br />Mr. Ullrich noted his preference for the stream plan and noted cost <br />is substantially less than for the culverted plan but cautioned that <br /> <br />--"-.- <br /> <br />----- ~-- <br />