My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
· Refined design according to survey input <br /> <br />Outreach for the design included the following: <br />· Community meetings (6/27/17 and 9/6/17). Meetings were advertised by flyers <br />mailed to addresses along the corridor (about 600 flyers), emails sent to the <br />residents on the contact list of about 70 residents (addresses were gathered at <br />community meetings and/or through communication with City staff) and posts on the <br />Mt. Carmel and Stafford Park neighborhoods on NextDoor. <br />· Internal coordination with the Fire Department <br />· Posting of the conceptual design at Stafford Park and at the “Dingy Circle” <br />(Broadway/Duane/Hopkins intersection) <br />· Community survey (12/4/17 to 12/18/17) <br />o Surveys were mailed to properties that share a frontage with Hopkins Avenue <br />(171 properties) <br />o Online survey was open to all and was emailed to meeting participants, <br />neighborhood associations, and posted on NextDoor <br />o Over 50% of the survey respondents (223) supported approval of the design. Of <br />the 53 responding properties with frontage on Hopkins Avenue, 62% supported <br />the design. Of those (170) who don’t have frontage on the corridor, 63% <br />supported the design. <br />· Public hearing at Complete Streets Advisory Committee (CSAC) (2/20/18) <br />Several residents attended the CSAC meeting to give additional feedback on the <br />design. Much of the conversation concerned the location of specific median islands <br />(relative to driveways and intersections) and the potential cost of this alternative. Other <br />comments included: <br />· Support for the exclusion of new stop signs along the corridor <br />· Support for median islands as the preferred traffic calming measure (instead of <br />buffered bike lanes) <br />· Concerns over noise from vehicles traveling over raised crosswalks <br />· Concerns about safety near the Dingy Circle area (Broadway/Duane/Hopkins <br />intersection) <br />· Requests for additional enforcement of traffic violations <br />After considering the feedback of the residents present, as well as feedback received <br />prior to the meeting, the CSAC recommended forwarding the Hopkins Avenue Traffic <br />Safety Project to the City Council for their consideration. The committee supported the <br />design as proposed, with the exception of the permanent medians, which they felt <br />should be piloted first. A pilot would allow the placement of medians to be tested, to <br />8.A. - Page 2
The URL can be used to link to this page
Your browser does not support the video tag.