My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-04-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-04-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:37:04 AM
Creation date
4/19/2018 2:03:30 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/23/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5) Traffic signage, pavement delineation and markings for all schools <br /> <br />The four bids received at the bid opening on March 28, 2018 are summarized in the <br />table below: <br />Bidder Bid Amount <br />Sposeto Engineering, Inc. – Livermore $728,066.40 <br />Golden Bay Construction, Inc. – Hayward $750,400.25 <br />FBD Vanguard Construction, Inc. – Livermore $973,442.70 <br />J.J.R. Construction, Inc. – San Mateo $1,052,544.10 <br /> <br />Engineer's Estimate <br />$1,000,000.00 to <br />$1,200,000.00 <br />Recommended Bidder: Sposeto Engineering, Inc. <br />Substantiation: Sposeto Engineering, Inc. is the lowest responsive and responsible <br />bidder <br /> <br />The low bid of $728,066.40 submitted by Sposeto Engineering, Inc. is approximately <br />27% lower than the engineer’s estimate of $1,000,000. The $1,000,000 is the <br />engineer’s estimate based on the original design. In the months prior to advertising the <br />project, staff value engineered the project, such as eliminating excess storm drain <br />improvements and reducing the area of concrete/asphalt concrete conforms. Staff <br />decided not to reduce the engineer’s estimate due to the trend of high bid prices for <br />recent projects with similar improvements. However, analysis of the two lowest bids <br />showed that some of the concrete bid prices were still lower than expected. The lower <br />than expected prices can be attributed to the difference in project location. The other <br />projects were constructing improvements exclusively at high usage roadways, such as <br />Middlefield Road and Brewster Avenue. The mixture of residential area and high traffic <br />roadways in this project allow the contractor to have an easier time to secure the job <br />site and manage delivery of concrete. <br /> <br />Construction is expected to begin at the end of May 2018, and to conclude within 120 <br />calendar days. City staff will develop an outreach plan, and give notice to all residents, <br />businesses, schools and organizations who might be affected by the construction. <br />Furthermore, staff will coordinate the construction and work with the schools to do work <br />during the summer break to the maximum extent possible. <br /> <br />ALTERNATIVES <br />Council may also choose not to amend the budget nor award the contract and direct <br />staff to redesign and/or rebid this project. <br /> <br /> <br />6.3.B. - Page 3
The URL can be used to link to this page
Your browser does not support the video tag.