Laserfiche WebLink
Accessing residential parking will not impact traffic on Maple Street or Blomquist <br />Street. <br />g) The reservation of landscaping areas for the purposes of separating or screening <br />service and storage areas from the street and adjoining building sites, breaking up <br />large expanses of paved areas, separating or screening parking lots from the street <br />and adjoining building sites, and separating building areas from paved areas to <br />provide access from buildings to open space areas; <br />Basis for finding: Sufficient landscaping is proposed on-site to separate and screen <br />the buildings, provide landscape walkways to the waterfront and provide an <br />enhanced landscaped Bay Trail for public use. Landscaping is provided between <br />buildings in landscaped courts, overhead within the alley courts and within a garden <br />playground. <br />h) In the case of any commercial or industrial structure, the review authority shall <br />consider its proximity to any R District and shall consider the effect of the proposed <br />structure upon the character and value of the adjacent R District area; <br />Basis for finding: The Project does not involve any commercial or industrial structure. <br />The Project consists of all residential structures. <br />i) The provision of permeable areas and drainage design appropriate to capture and <br />treat stormwater runoff prior to its discharge from the site including, but not limited <br />to, the use of vegetated swales, landscape features, permeable pavement materials, <br />infiltration basins or engineered designs. <br />Basis for finding: The City's Engineering division has reviewed the Project's <br />landscape features and areas, and bio-swale areas to capture and treat stormwater <br />run-off prior to discharge from the site, and determined that the Project would <br />comply. <br />Section 9: Sian Permit (SP2014-12): In the exercise of its independent <br />judgement, the Commission finds that: <br />a) The proposed signs are consistent with the Municipal Code and the General Plan. <br />Basis for finding: The proposed signs are of quality design that are compatible with <br />the contemporary architectural style of the development and reflect the marine <br />community. The sign material is durable and of high quality material. <br />Section 10: Additional Findinqs (pursuant to new Article 57 of the Redwood <br />Citv Zonina Code: In the exercise of its independent judgement, the Commission finds <br />that: <br />a) The project design includes measures, if required after study and evaluation that <br />effectively mitigate air quality and noise impacts on the proposed residential uses. <br />Basis for finding: The EIR evaluated the potential noise and air quality impacts on <br />the proposed development. With implementation of insulation measures and <br />mechanical ventilation, the development will be consistent with the City's noise and <br />air quality standards and will not result in a significant environmental impact. <br />ATTY/RESO.0027/PC RESO APPROVING PERMITS TO 1548 MAPLE STREET (STRADA) <br />REV: 04-13-18 PR <br />Page 6 of 22 <br />