My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:14:15 PM
Creation date
5/10/2018 5:23:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 3018 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Table 1: Mitigation Monitoring and Reporting Program <br />Timeframe for Responsibility for Oversight of <br />Impact <br />Mitigation Measures <br />Implementation Implementation Implementation <br />HAZ-I Continued <br />The contractor shall prepare a Waste Disposal and <br />Hazardous Materials Transportation Plan, which shall <br />i <br />be submitted to the City prior to any demolition and <br />construction activities. This plan shall describe the <br />analytical methods for characterizing wastes and the <br />handling methods required to minimize the potential for <br />exposure, and shall establish procedures for the safe <br />storage of contaminated materials and stockpiling of <br />soils. The required disposal method for contaminated <br />materials, the approved disposal site, and specific routes <br />used for transport of wastes to and from the project site <br />shall be indicated. <br />Hazardous materials and wastes generated during <br />demolition, grading, and trenching activities, shall be <br />removed, managed, and disposed of in accordance with <br />applicable regulations. <br />The requirements of the Response Plan listed above shall be <br />performed during all construction activities performed for <br />the proposed project, including after the completion of soil <br />remediation activities proposed in the Response Plan. <br />_ <br />HAZ-2: Construction of the <br />HAZ-2: Prior to demolition activities, a Hazardous Building <br />Prior to any Project Applicant Redwood City <br />proposed project and the project <br />Materials Survey (HBMS) shall be performed by an <br />demolition Community <br />variant could result in <br />appropriately certified environmental professional which <br />activities Development <br />accidental releases of hazardous <br />shall identify whether ACMs, PCBs, LBP, or other <br />Director <br />building materials that could <br />hazardous materials are present in the existing structures on <br />result in impacts to construction <br />the project site. Specification for the abatement and disposal <br />workers, the public, and/or the <br />of identified hazardous materials in accordance with <br />environment. <br />applicable regulations shall be prepared by an appropriately <br />certified environmental professional. The HBMS and <br />abatement specifications shall be submitted to and approved <br />by the City prior to the start of abatement activities. <br />AITY/RESO.0035/CC RESO CERTIFYING FINAL EIR-1548 MAPLE <br />REV: 04-30-18 PR <br />Page 44 of 49 <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.