My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res18 15661
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2018
>
Res18 15661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 1:14:15 PM
Creation date
5/10/2018 5:23:23 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/7/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LSA ASSOCIATES, INC. <br />APRIL 2018 <br />1548 MAPLE STREET PROJECT <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Table 1: Mitigation Monitoring <br />and Reporting Program <br />Timeframe for <br />_ <br />Responsibility for Oversight of <br />Impact <br />Mitigation Measures <br />Implementation <br />Implementation Implementation <br />HAZ-2 Continued <br />Abatement activities shall be performed by appropriately <br />certified personnel in accordance with all applicable laws <br />and regulations and documented in a Closeout Report <br />prepared by an environmental professional who shall <br />oversee the abatement activities. The Closeout Report shall <br />be submitted to the City for review and approval prior to the <br />_ <br />issuance of a demolition permit. __ <br />HAZ-3: Construction of the <br />HAZ-3: The project applicant shall include the following in <br />Prior to issuance <br />Project Applicant Redwood City <br />proposed project and the project <br />the Regional Water Board -approved Response Plan to <br />of certificate of <br />Community <br />variant could result in potential <br />ensure that potential health risks associated with exposure <br />occupancy <br />Development <br />health risks associated with <br />to VOCs are below established thresholds: <br />Director <br />exposure to VOCs. <br />Following excavation of impacted soil and backfilling of <br />excavations, soil gas confirmation samples will be collected <br />from: 1) previous sample locations with VOC concentra- <br />tions greater than appropriate risk thresholds; and 2) the <br />former engine repair facility. An appropriate amount of <br />time (to be indicated in the Response Plan) shall be allowed <br />for soil gas conditions to equilibrate in newly placed fill <br />material prior to the collection of soil gas confirmation <br />samples in areas where fill has been placed. Following <br />excavation and soil vapor confirmation sampling, the <br />potential health risks associated with vapor intrusion shall <br />be recalculated using previous and confirmation soil gas <br />sample results to determine if and where vapor mitigation <br />systems (VMS) would be required per the Response Plan. <br />The project applicant shall provide written approval from <br />the Regional Water Board of the successful implementation <br />of the Response Plan and proposed residential land use to <br />the City prior to issuance of a certificate of occupancy. <br />ATTY/RESO.0035/CC RESO CERTIFYING FINAL EIR —1548 MAPLE <br />REV: 04-30-18 PR <br />Page 45 of 49 <br />RESO. NO. 15661 <br />MUFF NO. 601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.