My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Recology
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 Recology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 10:54:00 AM
Creation date
6/13/2018 9:59:34 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Recology San Mateo County
PROJECT NAME
Franchise Agreement Recyclable materials, organic materials and solid waste 1/1/2021 to 12/31/2035
RMP File Number
803
Date
3/26/2018
Reso Ref
15651
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
280 I. Materials generated by State facilities (including public schools), provided that the <br />281 Generator has arranged services with other Persons or has arranged services with <br />282 the Contractor through a separate agreement; <br />283 J. The incidental removal of Solid Waste, Recyclable Materials, or Organic Materials <br />284 when the primary service performed is either of the following: <br />285 1. Landscaping, gardening, weed or refuse abatement, yard clean-up, or <br />286 grading of a lot; or, <br />287 2. Construction, remodeling, or demolition of a building or structure <br />288 K. Solid Waste generated at Residential Premises collected by others on an <br />289 infrequent, unscheduled, "on-call" basis (other than On -Call Bulky Item Collection <br />290 Service scheduled by Customers per Section 5.05). <br />291 4.03 GEOGRAPHIC LIMITS ON CONTRACTOR'S OPERATIONS <br />292 Contractor was established specifically to perform services for some or all of the <br />293 SBWMA Member Agencies. The methodology established in this Agreement, and in <br />294 those agreements between Contractor and other Member Agencies, for adjusting <br />295 Contractor's Compensation annually and allocating it among Member Agencies depends <br />296 on accurate financial and accounting records. For that reason, Contractor will limit its <br />297 operations to only SBWMA Member Agencies so that its annual financial reports will <br />298 contain only costs and revenues associated with service to those Member Agencies. <br />299 Affiliates of Contractor may perform services for other communities in San Mateo County <br />300 so long as they do not use Contractor's resources (equipment or labor) and so long as <br />301 costs associated with their operations are not included in Contractor's financial <br />302 statements. <br />303 <br />3MKINFUS 9IT, ll <br />ATTY/AGR.2018.054/Reoology of San Mateo <br />Page 10 of 126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.