Laserfiche WebLink
1289 2. Customer Database. Contractor shall use good faith efforts, within the <br />1290 constraints of its existing software system and cost structure, to develop a <br />1291 method for coding Mixed Use Buildings in the Contractor's customer service <br />1292 and routing databases to allow for various reports to be generated for Mixed <br />1293 Use Buildings. The approach to coding the Mixed Use Buildings, and <br />1294 implementation thereof, shall be reviewed and approved by the SBWMA on or <br />1295 before the Commencement Date. <br />1296 3. Collection Vehicles. At its option, Contractor may provide Collection service to <br />1297 Mixed Use Buildings using its Single -Family or Commercial Collection vehicles. <br />1298 <br />1299 <br />REV: 03-16-18 MI <br />Page 33 of 126 <br />ATTY/AGR.2018.054/Recology of San Mateo <br />