My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 Raycom Data Technologies Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 Raycom Data Technologies Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 10:24:55 AM
Creation date
7/9/2018 5:03:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Raycom Data Technologies Inc.
PROJECT NAME
Microfilm and Microfiche Digitization Project
RMP File Number
304
Date
6/25/2018
MO Ref
MO. 18-104
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The index will be verified by the Raycom index operator. RDIS software allows operator <br /> to automatically enter the index fields, with little or no manual entry and to verify what <br /> was entered against the aperture cards. <br /> Quality Control <br /> Raycom operational procedures are focused on quality at all times from receiving the <br /> items at Raycom to the very end of finalizing the delivery to the City. The Q/C operators <br /> will verify the directory structure and images quantity total against the production <br /> scanning log sheet and the preparation log sheet. A visual inspection of each image <br /> against the original will be performed, to make sure the images scanned are the same <br /> or better than the original. <br /> Any clean up and make cosmetic changes will be done utilizing RDIS Imaging software <br /> during the verification . Blank pages will be removed as required . Each image will be <br /> manually checked for clarity, legibility, quality, cut off images or file compression errors. <br /> The index database file will be verified to ensure all images are accurately indexed. <br /> The images will be authenticated to certify that they were scanned in the order as <br /> provided. Changes, quality issues, and initial for confirmation of inspection will be <br /> documented on the production scan log sheet. <br /> The Project Manager will be notified as to when the images are available for the <br /> Indexing operators to begin retrieving the images. The Q/C Operator will provide the <br /> production log sheet to the Project Manager when completed verifying the images. <br /> Delivery of Images and Index from Aperture Cards <br /> When the images from the aperture cards have been transferred to an encrypted <br /> external hard drive the media will be provided to the Raycom project manager for final <br /> approval prior to delivery to the City. The images will be transferred to an encrypted <br /> hard drive on a regular basis for the City to use immediately and verify. The regular <br /> transfers will allow the City to verify a manageable amount of images as to not be <br /> overwhelmed . Once the microfiche has been retrieved by City staff, the City will return <br /> the hard drive to Raycom . <br /> The media will be labeled with the delivery date, total count of boxes and box numbers, <br /> and include a copy of the transmittal sheet. <br /> Return of Aperture Cards <br /> Raycom will create a shipping ticket (return acknowledgement) indicating the image <br /> totals, directory structures, and other information on Raycom production log system. <br /> Raycom will provide the media to the City with the completed images at least once a <br /> month via an encrypted hard drive. Once the images have been transferred to the <br /> City's EDMS repository, the City will return the hard drive to Raycom to add the next set <br /> of images to it for the next delivery. <br /> REV: 06-19-18 PR <br /> Page 20 of 23 <br /> ATTY/AGR.201 8. 1 32/Raycom Data Technologies, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.