Laserfiche WebLink
SITE 06: REDWOOD CREEK/BRADFORD STREET <br />h <br />APPROX. HIGH TIDE <br />1 <br />I <br />10' <br />CREEK 9ED CREEK BANK BIKE } <br />PEDESTRIAN <br />PATH <br />EXKTIMG PEM NSuLA <br />BOARDWALK RETAIL <br />C4iu1PLE}( <br />V PROPOSED NEAR—TERM SITES <br />M i n. Trai I Elevatio n i s <br />10' (baw flood <br />elevation per FEMA) <br />Z' 2` 6' <br />Guidelines: DECOMPOSED DECOMPOSED LANDSCAPEBUFFER <br />GRANITE GRANITE (SPACE PERMITTING) <br />Redwood Creek- East Bank <br />Redwood Creek East Bank should follow similar guidelines to the West Bank, and • Interpretative Signage: Include signage and environmental graphics to convey <br />address/include additional elements such as: the history and natural resources of Redwood City and Redwood Creek <br />• Lighting. Pedestrian scale lights to provide safe illumination; consistent from . Gateways: Create identifiable gateways to clearly connect the Redwood Creek <br />one property to the next, and consistent with properties along the West Bank Trail with Downtown and the Bay Trail <br />• Wayfinding. Signage and environmental graphics to indicate use and . Landscaping. Restoration of native plant material and habitat where possible <br />destinations <br />• Site furnishings: Provide durable site furnishing along pathway including <br />benches, tables and trash receptacles that conform with the overall trail <br />character <br />24 SEPTEMBER 2018 <br />0 <br />