My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-09-24 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-09-24 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 5:18:32 PM
Creation date
9/20/2018 5:27:29 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/24/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V PROPOSED NEAR—TERM SITES <br />Redwood Creek- West Bank <br />Recommendations <br />The West Bank of the Redwood Creek Trail falls within the the rules and <br />regulations outlined in the North Main Street Precise Plan. The most applicable <br />regulations for trail development along the West Bank of Redwood Creek <br />are outlined in the previous "Guidelines" section of this report. The general <br />information and details about Creek Trail Development provided in the North <br />Main Street Precise Plan should be adhered to moving forward with one <br />added recommendation for consideration by City Council and the Community <br />Development Department: When an application fora Planned Community <br />Permit (PC) is submitted for a property within the North Main Street Precise Plan <br />Area, a copy of the application and project plans shall be routed to the Parks, <br />Recreation and Community Services Department for review and comment on <br />the design and placement of the Redwood Creek Trail and access to the trail. <br />Top Photo: Existing West Bank Trail at <br />the rear of 333 Main St. looking South <br />towards 353 Main Street <br />Bottom Photo: Existing West Bank Trail <br />at the rear of 333 Main St. looking North <br />towards 305 Main St <br />SITE 06: REDWOOD CREEK/BRADFORD STREET <br />52 DOWNTOWN PARKS SITE ASSESSMENT 6 FEASIBILITY STUDY REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.