Laserfiche WebLink
VIII COST FORECAST <br />Baseline Cost Assumptions & Considerations <br />APPENDIX <br />SITE 01: Winslow Street <br />The Winslow Street site has minimal existing utility <br />constraints and significant available space for new <br />programing ideas. Possible construction costs <br />beyond the baseline assumptions may include <br />sidewalk replacement to accommodate additional <br />path connections and street improvements to <br />enhance pedestrian crossing. Potential park <br />program could include an interactive water feature, <br />park shelter, paved plaza, play area and lawn area. <br />146 <br />SITE 02: Library Campus/ Roselli Park <br />Cost implications to consider in addition to <br />baseline assumptions for the Library Campus <br />and Roselli Park site include potential fiber optic <br />infrastructure impacts, new connections to the <br />existing storm drain culvert, and re -grading the <br />existing frontage slope along Jefferson Ave. <br />Potential park program could include a park <br />shelter, paved plaza, play area, and lawn area. <br />The overall cost of park improvements will be <br />affected by whether Lot A or Lot B or Roselli or <br />some combination of the three is developed. The <br />cost estimate assumes that one-third of the site of <br />41,000 SF will be improved. <br />SITE 03: City Hall <br />This centrally located site currently contains <br />large existing utility structures that may heighten <br />construction costs. Potential cost items to note are <br />storm drain culvert structures which may require <br />adjustment to grade, above grade utility cabinet <br />relocations, and service and emergency vehicle <br />site access requirements. Potential park program <br />could include an interactive water feature, park <br />shelter, paved plaza, play area, lawn area, and <br />garden . The overall cost will be affected by the <br />physical extent of the site improvements. Due to <br />the overall size and configuration there could be <br />options for improving all or a portion of the site. <br />DOWNTOWN PARKS SITE ASSESSMENT 6 FEASIBILITY STUDY REPORT <br />v <br />(D <br />W <br />0 <br />