My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-10-01 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-10-01 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2018 9:21:59 AM
Creation date
9/27/2018 4:55:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Bulb-outs at the intersections of Goodwin/Alameda, Connecticut/Oregon, and <br />Connecticut/Washington <br />3. Storm drain inlets and pipes <br />4. Median island construction at the intersection of Alameda/Goodwin <br />5. Traffic signage, pavement delineation and markings <br />6. Excavation, backfill and compaction as necessary <br />7. Dust alleviation and control, storm water pollution prevention and daily site clean <br />up <br /> <br /> <br />The eight bids received at the bid opening on September 5th, 2018 are summarized in <br />the table below: <br /> <br /> Bidder Bid Amount <br />1 FBD Vanguard Construction Inc. $1,184,600.00 <br />2 Interstate Grading & Paving, Inc. $1,298,736.80 <br />3 O’Grady Paving, Inc. $1,305,527.00 <br />4 JJR Construction, Inc. $1,428,000.00 <br />5 Golden Bay Construction Inc. $1,439,484.50 <br />6 R&S Construction Management, Inc. $1,517,307.75 <br />7 Sposeto Engineering, Inc. $1,586,248.10 <br />8 CF Contracting, Inc. $1,622,264.00 <br /> <br /> Engineer’s Estimate $1,230,000.00 <br /> <br />The low bid of $1,184,600.00 submitted by FBD Vanguard Construction, Inc. is 3.69% <br />lower than the Engineer’s Estimate of $1,230,000.00. Staff recommends awarding the <br />contract to FBD Vanguard Construction, Inc. as they are the lowest responsive and <br />responsible bidder. The contract is based on the City’s standard form construction <br />agreement with limited revisions to match the requirements of the Stormwater <br />Treatment Measures Maintenance Agreement with the Redwood City School District, <br />such as naming the RCSD as additional insured along with the City, site cleanup, <br />6.1.B. - Page 3
The URL can be used to link to this page
Your browser does not support the video tag.