Laserfiche WebLink
<br />78 <br />Page 21 <br /> <br />\ <br /> <br />DOWNTOWN REDWOOD CITY <br />A Parking Management Proposal <br /> <br />. Spot steamcJean garages as necessary" <br /> <br />. Remove al/ trash and debris from trash contaihersthroughout <br />parking facilities to City-provided dumpstersltrash receptacles <br /> <br />. Report any hazarcJÒus conditions noted and any lights that are <br />not working** <br /> <br />"Note: Steam cleaning is generally not recommended fur asphalt surface lots <br />as it can easily destroy these POfOl,/S SlJrfaces and so no costs have been <br />included for same at the Middlefield lot. <br /> <br />-Depending on thety~ and location of bumed-out lights} janitorial personnel <br />mayrep/ace same with City-provided supplies, but a site-specific reviewwi/f <br />need to be conducted to confirm this. Specialized lighting (i.e., HPS, etc. or <br />lighting requiring specialized equipment, knowledge or safety equipment) <br />may require others to perform this work. <br /> <br />Within 30 days of commencement of operations, we will formalize the <br />foregoing into a site-specific schedule for aU faciliti~ based on the <br />National Parking AS$ociation'$ recommended Parking Facility <br />Maintenance Schedule for approval by the City. <br /> <br />As noted above, ABM Janitorial ServIces will provide a ridings\/Vèeper <br />as part of its proposed cost. This means that our garage manager can <br />direct them to sweep whÎChøver facility is in need of same at any time, <br />without the need to modify our operating expense in this area. <br /> <br />Routine maintenance of the facilities' entry/exìtgates will beperforrned <br />by Ampco System personnel,after receiving training in same from the <br />vendor, McGann ÁSsocíates. This will include replacement of broken <br />gate arms and other routine maintenance needs associated with such <br />devices, Due to the limited staffing proposed, all of Ampco's personnel <br />wilfbe trained to provide such$ervices. . <br /> <br />As noted in the <specifications, all other on-{ oing equipment <br />maintenance and repair will be provided under contract by McGann <br />Associates. If døsired, Ampco will handle the biJIing for these$ervices <br />directly with McGann beginning with the second year of the contract. <br />There witlbe no additionaloharge to the City to have Ampco handle <br />the billing for these services. Please note that Ampco.'s ma~ger will <br />monitor the contract with McGann beginning with our first month of <br />operation to ensure that all required preventative service and <br />maintenance is being performed by McGann in accordance with any <br />agreement entered into between McGann and the City. <br /> <br />Ampco System Parking <br />Page 17 <br />