6.D. - Page 2 of 5 <br />at the northwest end of Egret Lane) and Pump Station No. 20 (located on Shearwater Parkway between <br />Canvasback Way and Mindanao Drive). These pump stations serve the Redwood Shores neighborhoods. <br />The subject contract includes the following: furnishing labor, materials, tools, equipment and incidentals <br />for the improvements of the two existing sanitary sewer pump stations. Specific project components <br />include, but are not limited to: removal and replacement of existing mechanical and electrical structures; <br />rehabilitation and repair of and existing wet well; furnishing, installation of a temporary by-pass system, <br />submersible pumps, motor control center; complete standby generator; and connection of pump stations <br />to existing force mains. <br />Associated work includes saw -cutting, pavement removal and trenching, sheeting, shoring and bracing, <br />dewatering, backfill, controlled density fill, base compaction, sidewalk restoration, landscape restoration, <br />and asphalt and concrete pavement restoration work. The contract also covers mobilization, <br />demobilization, traffic controls, notification, furnishing and installation of project signs, pollution <br />elimination systems and other incidentals. The exact locations involved are shown on the drawings. <br />ANALYSIS <br />Five bids were received for the Sanitary Sewer Pump Station Improvements Project - P.S. No. 18 and P.S. <br />No. 20 by the bid deadline on October 10, 2018. The bid amounts are summarized in the table below. <br />BIDDER <br />BID AMOUNT <br />Casey Construction Inc.- Emerald Hills <br />$1,682,653 <br />Anderson Pacific Engineering Construction, Inc. - Santa Clara <br />$1,822,71 <br />Valentine Corporation - San Rafael <br />$2,158,369 <br />Anvil Builders, Inc. - San Francisco <br />$2,179,826 <br />Disney Construction, Inc. - Burlingame <br />$2,232,63 <br />ENGINEER'S ESTIMATE <br />$1.8 to 2.0 Million <br />The low bid of $1,682,653 submitted by Casey Construction Inc. is 6.52% lower than the low end of the <br />engineer's estimate of $1,800,000 for the cost of construction. <br />Staff also reviewed several references provided by Casey Construction Inc. for similar completed projects. <br />The references provided satisfactory feedback in regards to accountability and performance of the <br />contractor. Based on the bids received and feedback from the references, staff believes that the low bid <br />is reasonable and with economy scale in mind, recommends awarding the contract for both base bid (P.S. <br />No. 20) and alternate bid (P.S. No. 18) to Casey Construction Inc. <br />Construction is anticipated to begin in April 2019, and conclude in July 2019. Notification of the proposed <br />work will be mailed to area residents, property owners, business owners, and schools. The contractor is <br />required to distribute an additional notice 14 days in advance of the start of work in their immediate area. <br />Updates on the progress of construction will be available on the City's website. <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />78 <br />