Laserfiche WebLink
• Prepare signal timing sheet for Traffic Signal Timing Coordination; <br />• Prepare Safe Route to School and Green Infrastructure exhibits and calculation; <br />• Conduct Stormwater Pollution Prevention Plan (SWPPP) Assessment; <br />• Collect and review Utility Facility Maps; <br />• Collect and review recorded drawings; <br />• Coordinate with utility agencies; <br />• Prepare base map showing existing improvements; <br />• Prepare underground utility mapping; <br />• Prepare for review by the city, 50% design drawing consisting of cross-sections, construction notes, <br />detailing of major components, landscaping components, construction cost estimates, and <br />construction schedule; <br />• Prepare a design recommendation memo outlining the proposed and optional <br />additional/recommended improvements that could be supported by the project budget. <br />Assumption: For the typical location, development of 1 alternative is assumed. Additional alternatives would <br />require an amendment to this agreement as set forth in Task 8. City will choose up to 3 locations where <br />options/alternatives are to be designed. These will be vetted during Task 2, and no significant design changes <br />will be made in subsequent tasks. <br />Task Deliverables: <br />Two (2) sets of fifty -percent (50%) design plans (24"x36" drawing). Topographic survey, 50% plan set and <br />engineer's estimate in PDF format and AutoCAD files of plan set (version 2015). <br />Consultant shall prepare a response matrix listing City's review comments and consultant's responses to <br />those comments. Consultant shall incorporate City and consultant agreed-upon comments. The consultant <br />shall return the original redline comments from the City with the succeeding submittals. <br />Consultant shall perform the tasks including, but not limited to, the following: <br />• Meet with the City to discuss the comments on 50% design submittal; <br />• Review and Respond to City's Review Comments in a Comment Matrix; <br />• Incorporate 50% design submittal review comments; <br />• Prepare design specifications; <br />• Prepare Rectangular Rapid Flash Beacon (RRFB) detail sheet for the following 4locations: <br />o Bay Rd/Tenth Ave and Florence St/Seventeenth Ave shall be solar powered, <br />o Bay Rd/8th Ave and Spring St/Flynn Ave shall be connected to existing electrical services; <br />• Prepare Safe Route to School and Green Infrastructure plan; <br />• Modify design components based on underground utility conflicts; <br />• Prepare 90% design drawing consisting of cross-sections, construction notes, detailing of major <br />components, landscaping components, specification outline, construction cost estimates, and <br />construction schedule. <br />REV: 11-01-18 PR <br />Page 12 of 17 <br />ATTY/AGR.2018.248/CSG Consultants, Inc. <br />