My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-01-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-01-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:35:29 AM
Creation date
1/24/2019 4:28:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 18 of 170 <br />Request for Qualifications: <br />General Park Building Construction, Retrofit, Maintenance, and/or Repairs <br />RESPONDENT ERRORS/WITHDRAWAL OF RESPONSES <br />In general, a Respondent will not be released on account of errors. After Responses have been opened and declared, no <br />Responses shall be withdrawn, except with the consent of the Board and only under the following conditions: <br />The Respondent sends within five (5) calendar days after the opening of the Responses, a written notice of a material <br />error in the Response to the Board Secretary at the following address: <br />Board of Recreation and Park Commissioners <br />Attention: Board Secretary <br />221 North Figueroa St., Suite 300 <br />Los Angeles, CA 90012 <br />In the notice, the Respondent: <br />Specifies that the error results in a Response that is materially different than intended and describes in detail <br />how the error occurred; <br />Provides supporting documentation, including original material (should RAP require additional <br />clarification, information and/or documentation, the Respondent must respond within two (2) working days <br />after receiving notification from the Board Office); <br />Acknowledges that should their request to withdraw be granted by the Board, it is with the understanding <br />that the Board will not accept a Response from them on this contract should there be a need to re -issue this <br />RFQ. <br />Errors involving substitution of the listed Subcontractors are detailed elsewhere in this RFQ under the section entitled, <br />Subletting and Subcontractors. <br />IMPORTANT — RESPONDERS MUST SUBMIT ALL REQUIRED FORMS (COMPLETELY FILLED OUT) BY RFQ <br />SUBMITTAL DEADLINE. <br />Page 13 of 103 <br />101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.