Laserfiche WebLink
6.D. - Page 79 of 170 <br />Request for Qualifications: <br />General Park Building Construction, Retrofit, Maintenance, and/or Repairs <br />Required Documentation: An employee of the Responder's company must attend the pre -submittal meeting <br />scheduled for this project. Credit may not be given if the employee arrives late or fails to sign the pre -submittal <br />meeting attendance roster. This requirement will be waived if the Responder both certifies in writing that it is <br />informed as to the BIP Outreach requirements for the project and has participated in a City-ssponsored or City - <br />approved matchmaking event in the prior twelve (12) months as is evidenced by the event attendance documents. <br />Note: If the RFQ states that the pre -submittal meeting is mandatory, then attendance at the pre -submittal meeting <br />is the only way to pass this indicator. <br />3 1 SUFFICIENT WORK IDENTIFIED FOR SUBCONSULTANTS <br />The Responder has identified the minimum number, as determined by RAP, of specific items of work that will be <br />performed by subconsultants. This will ensure an opportunity for sub -consultant participation among MBEs, WBEs, <br />SBEs, EBEs, DVBEs, and OBEs. <br />Required Documentation: Outreach via e-mail in the selected potential work items. This outreach must be <br />performed using the BAVN's BIP Outreach system. The outreach must be to potential MBE, WBE, SBE, EBE, <br />DVBE, and OBE subconsultants who are currently registered on the BAVN. Failure of the Responder to outreach <br />in all of the potential work items selected by the City as potential subconsulting work items may result in the RFQ <br />response being deemed non-responsive. <br />Note: City staff will access the BAVN and verify compliance with this indicator after the RFQ submission deadline. <br />4 1 WRITTEN NOTICES TO SUBCONSULTANTS <br />All notifications must be provided utilizing BAVN, and made not less than fifteen (15) calendar days prior to the <br />date the RFQ responses are required to be submitted. In all instances, Responders must document that invitations <br />for sub -consulting bids were sent to available MBEs, WBEs, SBEs, EBEs, DVBEs and OBEs for each item of work <br />to be performed. <br />Required Documentation: E-mail notification in each of the selected potential work items to potentially available <br />MBEs, WBEs, SBEs, EBEs, DVBEs and OBEs for each anticipated work item to be performed. The notification <br />must be performed using the BAVN's BIP Outreach system. The notification must be to potential subconsultants <br />currently registered on the BAVN. If the Responder is aware of a potential subconsultant that is not currently <br />registered on the BAVN, it is the Responder's responsibility to encourage the potential subconsultant to become <br />registered so that the Responder can include them as part of their outreach. Notifications must contain areas of <br />work anticipated to be sub -consulted, City of Los Angeles project name, name of the Responder, and contact <br />person's name, address, and telephone number. Responders are required to send notifications to a sufficient number <br />of firms comprised of MBEs, WBEs, SBEs, EBEs, DVBEs and OBEs in each potential work item chosen, as <br />determined by the City. What is considered sufficient will be determined by the total number of potential <br />subconsultants in each specific work item. <br />The City will determine each work area by the North American Industry Classification System (NAICS) code. The <br />following table shows the sufficient number of MBE, WBE, SBE, EBE, DVBE and OBE subcontractors that need <br />to be notified for each work area. <br />IMPORTANT — RESPONDERS MUST SUBMIT ALL REQUIRED FORMS (COMPLETELY FILLED OUT) BY RFQ <br />SUBMITTAL DEADLINE. <br />Page 73 of 103 <br />162 <br />