My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-01-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-01-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:35:29 AM
Creation date
1/24/2019 4:28:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 80 of 170 <br />Request for Qualifications: <br />General Park Building Construction, Retrofit, Maintenance, and/or Repairs <br /># of Subcontractors in NAICS Code <br />% Prime Must Notify <br />Number Prime Must Notify <br />1-10 <br />100% <br />1-10 <br />11-20 <br />80% <br />9-16 <br />21-50 <br />60% <br />13-30 <br />51-100 <br />40% <br />21-40 <br />101-200 <br />25% <br />26-50 <br />>200 <br />10% <br />20+ <br />A Responder's failure to utilize this notification function will result in their RFQ response being deemed non- <br />responsive. <br />Note: Responders will not be able to utilize the BAVN's BIP Outreach notification function if there are less than <br />fifteen (15) calendar days prior to the RFQ response submittal deadline. In utilizing the BAVN's notification <br />function, Responders will receive a message if they have failed to outreach to a sufficient number of firms when <br />they go to view their summary sheet. Responders will be given an opportunity to include their own customized <br />statements when utilizing the notification function. However, the City will take into consideration the wording and <br />may deem a Responder non-responsive if the wording is perceived to seriously limit potential subconsultant <br />responses. City staff will access the BAVN and verify compliance with this indicator after the RFQ submission <br />deadline. Responders are encouraged to print their BIP Outreach summary sheet prior to logging out as documented <br />proof of their progress. <br />5 1 PLANS, SPECIFICATIONS AND REQUIREMENTS <br />The Responder provided interested potential subconsultants with information about the availability of project scope, <br />services requested, and other requirements for the anticipated subconsulting work. <br />Required Documentation: Include in Indicator 4, information detailing how, where and when the Responder will <br />make the required information available to interested potential subconsultants. The notification must be performed <br />using the BAVN's BIP Outreach system. <br />Note: For purposes of RFQs, making a copy of the RFQ available to potential sub -consultants will meet this <br />requirement. At the time a Responder utilizes the BAVN's BIP Outreach notification function, the required <br />information will automatically be included in the notification. Responders will not be able to utilize the BAVN's <br />BIP Outreach notification function if there are less than fifteen (15) calendar days prior to the RFQ response <br />submittal deadline. City staff will access the BAVN and verify compliance with this indicator after the RFQ <br />submission deadline. <br />6 1 NEGOTIATED IN GOOD FAITH <br />The Responder has responded to every unsolicited offer sent by a Registered Subcontractor using BAVN and has <br />evaluated in good faith bids or responses submitted by interested potential MBEs, WBEs, SBEs, EBEs, DVBEs, <br />and OBEs. Responders must not unjustifiably reject as unsatisfactory a bid or response offered by a Registered <br />Subcontractor, as determined by the Awarding Authority. The Responder must submit a list of all subcontractors <br />for each item of work, including dollar amounts of bids or responses received. This list must include an explanation <br />of the evaluation that lead to the bid or response being rejected and the explanation must have been communicated <br />IMPORTANT — RESPONDERS MUST SUBMIT ALL REQUIRED FORMS (COMPLETELY FILLED OUT) BY RFQ <br />SUBMITTAL DEADLINE. <br />Page 74 of 103 <br />163 <br />
The URL can be used to link to this page
Your browser does not support the video tag.