My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-01-28 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-01-28 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:35:29 AM
Creation date
1/24/2019 4:28:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/28/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 81 of 170 <br />Request for Qualifications: <br />General Park Building Construction, Retrofit, Maintenance, and/or Repairs <br />to the subcontractor using BAVN. <br />Required Documentation: <br />a. Schedule A List of Potential MBE/WBE/S13E/EI3E/DVBE/OBE Subconsultants; <br />b. An online Summary Sheet organized by work area, listing the following: <br />1) The responses and/or bids received; <br />2) The name of the subconsultant who submitted the bid/quote; <br />3) A brief reason given for selection/non-selection as a subconsultant; <br />c. Copies of all potential MBE/WBE/SBE/EBE/DVBE/OBE bids or quotes received must be submitted prior to <br />award of a contract by the City; <br />The reasons for selection/non-selection should be included in the notes section of the online Summary Sheet. If the <br />Responder elects to perform a listed work area with its own forces, they must include a bid/quote for comparison <br />purposes and an explanation must be provided and included on the summary sheet. All bids/quotes received, <br />regardless of whether or not the Responder outreached to the subconsultant, must be submitted and included <br />on the on-line Summary Sheet. To that extent, the City expects the Responder to submit a bid from each <br />subconsultant listed on the online Summary Sheet, including those listed on the Responder's Schedule A. All <br />potential subcontractors with whom the bidder has had contact outside of the BAVN must be documented <br />on the online Summary Sheet. <br />The summary sheet must be performed using the BAVN's BIP Outreach system and must be submitted by <br />4:30 p.m. on the first calendar day following the day of the RFQ response submittal deadline. If a bid/quote is <br />submitted by a firm that is not registered with the BAVN, the Responder is required to add that firm to their summary <br />sheet. A Responder's failure to utilize the BAVN's summary sheet function will result in their RFQ response being <br />deemed non-responsive. <br />Note: For the purposes of this RFQ only, letters of intent acknowledging a potential sub -consultant's interest in <br />being contacted for work and/or hourly rates for their type of work will be considered the "bids or quotes received." <br />Staff will request copies of all of the bids/quotes received as part of the BIP Outreach evaluation process. <br />Responders must have a bid/quote from each potential subconsultant listed on their Schedule A prior to submission <br />of the Schedule A. The submission of the Schedule A is outlined in G herein. Responders are encouraged to submit <br />all of their bids/quotes with their RFQ response submittal. Responders will not be able to edit their summary sheet <br />on the BAVN's BIP Outreach summary sheet function after 4:30 p.m. on the first calendar day following the day <br />of the RFQ response submittal deadline. City staff will access the BAVN and verify compliance with the summary <br />sheet provision of this indicator after the RFQ submission deadline. Responders are required to have each of the <br />subconsultants on their Schedule A registered on the BAVN prior to being awarded the contract. <br />7 1 BOND, LINES OF CREDIT, AND INSURANCE ASSISTANCE <br />Each notification by the Responder shall also include an offer of assistance to interested potential MBEs, WBEs, <br />SBEs, EBEs, DVBEs, and OBEs in obtaining bonds, lines of credit, or insurance required by the Awarding <br />Authority or Responder. <br />Required Documentation: Include in Indicator 4, information about the Responder's efforts to assist with bonds, <br />lines of credit and insurance. The notification must be performed using the BAVN's BIP Outreach system. <br />Note: At the time a Responder utilizes the BAVN's BIP Outreach notification function, the required information <br />will automatically be included in the notification. Responders will not be able to utilize the BAVN's BIP Outreach <br />notification function if there are less than fifteen (15) calendar days prior to the RFQ response submittal deadline. <br />Responders will be given an opportunity to include their own customized statements when utilizing the notification <br />IMPORTANT — RESPONDERS MUST SUBMIT ALL REQUIRED FORMS (COMPLETELY FILLED OUT) BY RFQ <br />SUBMITTAL DEADLINE. <br />Page 75 of 103 <br />164 <br />
The URL can be used to link to this page
Your browser does not support the video tag.