Laserfiche WebLink
Appendix 1: AQ/HRA SOW <br />will use an approach similar to those required of HUD -funded projects for calculations of STC, and <br />will specify the necessary STC values for windows and doors (to meet the interior noise standard) <br />based on the exterior wall, window and door specifications provided to us by the project applicant. <br />• Transportation and Circulation: Consultant's transportation expert will augment the ongoing <br />Transportation Impact Analysis (TIA) for 1601 EI Camino Real to integrate the proposed residential <br />development at 1304 EI Camino Real. In addition, a separate tech memo for the 1304 EI Camino <br />Real site will be prepared to support the consistency analysis of transportation impacts for this site. <br />The additional analysis of 1304 EI Camino Real will specifically address: <br />o Site access and interface with Jackson Avenue and EI Camino Real including corner <br />sight distances and a review of driveway spacing <br />o Emergency vehicle access and circulation <br />o Vehicular circulation <br />o Pedestrian access and circulation within and adjacent to the site <br />o Bicycle access and circulation within and adjacent to the site <br />o Parking supply in comparison to City Code requirements and ITE parking demand <br />The scope will utilize the existing Phase I report for 1304 EI Camino Real to support the Initial Study <br />consistency analysis. No further investigations of potential hazards (e.g., Phase II) is required. <br />2. Task 2: Project Description <br />Consultantwill prepare the Project Description of the 1304 EI Camino Real site within ten business days <br />of receiving a notice to proceed (NTP) from the City. The Project Description will be based on the <br />information already provided by the project applicant, and any additional information that becomes <br />available prior to the NTP. The draft Project Description will be submitted to the City for review and <br />subsequently revised for incorporation into the various technical studies and the Initial Study <br />consistency analysis described below. <br />3. Task 3.1: 1304 EI Camino Real Administrative Draft 15183 Consistency Analysis <br />The scope of work for Task 3 will be augmented to include the following changes: <br />• Consultant will use the 2019 CEQA Guidelines Appendix G checklist to analyze the project. <br />• Consultant will prepare a separate stand-alone 15183 consistency analysis of 1304 EI Camino <br />Real. Consultant will use the Initial Study format to perform the analysis. The discussion will focus <br />on consistency of the proposed development with the DTPP and DTPP EIR. Any additional <br />analysis of 1304 EI Camino Real would be limited to those environmental effects which: <br />1) are specific to the project or the parcel; <br />2) were not analyzed as significant effects in the DTPP EIR; <br />3) are potentially significant off-site impacts and cumulative impacts which were not <br />discussed in the DTPP EIR; or <br />4) are previously identified significant effects which, as a result of substantial new <br />information which was not known at the time the DTPP EIR was certified, or are <br />determined to have a more severe adverse impact than discussed in the prior EIR. <br />Task 3.2: 1304 EI Camino Real Final 15183 Consistency Analysis <br />Consultant will revise the draft consistency analysis to address consolidated review comments from the <br />City. Consultant will produce a final consistency analysis, which will be incorporated into the Focused <br />EIR as described under Task 4.1 below. <br />The Task 3 scope of work will provide a consistency analysis of the proposed development at 1304 <br />EI Camino Real, <br />4. Task 4.1: Expanded Administrative Draft EIR <br />While the assessment of 1304 EI Camino Real primarily involves documenting consistency with the <br />DTPP EIR, the EIR will be expanded to include a description of the proposal for this project site as well <br />as a summary of the impacts at this location. The consistency analysis of 1304 EI Camino Real <br />described under Task 3 will be provided as an appendix to the EIR and the associated impacts <br />AT-FY/AGR/2019/AMENDMENTS/AMEND NO.1-AECOM <br />REV: 06-17-19 PR <br />Page 2 of 22 <br />