My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:54:06 AM
Creation date
4/4/2019 4:43:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/8/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.F. - Page 15 of 32 <br />NOTICE OF INTENT TO AWARD FOR CONSTRUCTION <br />DATE POSTED: JANUARY 11th, 2019 <br />PROJECT TITLE: CALIFORNIA WATER TANK, PUMP STATION AND TRANSMISSION MAIN <br />PROJECT — Bid Opening Date December 19, 2018. <br />City Staff has completed the bid evaluation and intends to recommend to the City Council of the City of <br />Redwood City award of the above -referenced project in the coming weeks to: <br />TMB Construction, Inc, <br />(Name of Contractor). <br />Evaluation and Recommendation Summary: <br />Disney Construction Inc.'s Total Base Did did not equal the summation of all of the Line Item Costs in the <br />Base Bid Schedule. Per Section 00200 1.14F of the project specifications, the discrepancy between the <br />Base Bid line item totals and the Base Bid Total shall be resolved in favor of the correct sum of the Base <br />Bid line items. Secondly, the Base Bid Line Item #14 total does not equal the product of the unit price <br />and the line item quantity. Per Section 00200 1.14E of the project specifications, the unit price shall <br />prevail. Resolving the discrepancies noted, Disney Construction Inc. is the apparent low bidder with a <br />Total Bid of $10,022,000. <br />JMB Construction Inc. Base Bid Line Item #24 does not equal the product of the unit price and line item <br />quantity. Per Section 00200 1.14E, states that if a specified unit price is ambiguous, unintelligible, <br />uncertain or omitted, and the total price set forth for that Item is clear, the total price shall prevail, and the <br />unit price shall equal the stated total price divided by the stated quantity. For this reconciliation, JMB <br />Construction Inc. is the next lowest bidder with a Total Bid of $10,814,761. <br />Disney Construction Inc. has submitted a notice of an error in their bid, provided evidence for <br />establishing the existence of each element required by Section 5103 of the Public Contract Code for a <br />relief of bid; and requested for relief. Staff intends to recommend to the City Council of the City of <br />Redwood City to provide relief to Disney Construction, Inc., and reject their bid and award to the <br />apparent second lowest bidder JMB Construction, Inc. <br />Staff requests that JMB Construction Inc. signs and returns the Notice to confirm that JMB <br />Construction Inc. agrees with the bid evaluation, and is willing and able to perform the work for <br />the Total Bid of $10,814,761 within one working day of this notification. <br />SIGNATURE--- ,a/ � DATE / <br />Saber Sarwary, P.E. <br />City Engineer <br />SIGNATURE iGl1e,�' DATE <br />JMB�ion Inc. Representative <br />Send via emails to JMB and Disney on January 11`h, 2019. <br />122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.